Orange County NC Website
d�ll'll�j;VUllJd!i�!n'li III Yltl'dlll <br />RR6400 50 9�22 <br />,I O� Forest Management <br />Everywhere on the Property, trees may be removed, cut and otherwise managed to control <br />insects and disease, to prevent personal injury and property damage, to remove non-native <br />species,. for pasture restoration, for firewood and other non-commercial uses, including <br />construction of permitted improvements and fences on the Property, so long as done in <br />accordance mith the Conservation Plan referenced in Paragraph 9 (Conservation Practices) of this <br />Conservation Easement and in accordance with a Forest Management Plan that is prepared by a <br />professional licensed forester, and that is approved by Grantee, which approval shall not be <br />unreasonably withheld. <br />Any other cutting, removal or harvesting of trees, including any commercial harvesting of <br />trees, may be undertaken only if it occurs outside of the stream buffer described in Paragraph 4 <br />(Right to Farrn) of this Conservation Easement and it is in accordance with the Conservation <br />Plan and Forest Management Plan referred to in this Paragraph 10 (Forest Management). <br />Trees may be planted, harvested and removed within the area identified and marked as <br />the one-acre future "Residential 1- nvelope" once its location has been designated, all without the <br />,advance written permission of the Gnantee. <br />11. Alining <br />There shall be no filling, excavation, dredging, mining or drilling, removal of topsoil, <br />sand, gravel, rock, peat, minerals or other materials; and no change in the topography of the land <br />in any manner except as necessary for the purpose of normal and customary farming operations <br />in accordance with the Conservation Plan or combating erosion or flooding in accordance Nvith <br />the Conservation Plan and as reasonably necessary for any maintenance, construction or <br />reconstruction on the Property permitted herein. Disturbed areas for the purpose of removing <br />soil, gravel, rock, peat, minerals or other materials necessary for permitted customary agricultural <br />uses on the Property will be limited to one acre in total surface area and will be restored as soon <br />as practicable after the disturbance, Under no circumstances is the drilling for or exploration for <br />hydrocarbons permitted in under, on or to the Property. <br />12 Road Construclion <br />Construction and maintenance of farm roads that may be reasonably necessary and <br />incidental to carrying out the improvements and uses permitted on the Property by this <br />Conservation Easement are permitted, No roads constructed on the Property shall be paved or <br />otherwise covered with concrete, asphalt, or any other impervious material, without the advance <br />written permission of the Grantee, For purposes of this Conservation Easement gravel roads <br />shall not be considered impervious, Grantee shall not give such permission unless the Grantee <br />determines that the proposed paving, or covering of the soil, or the location of any such road, will <br />not diminish or impair the Conservation Values, of the Property. <br />Page 9 of 18 <br />