Browse
Search
OCPB agenda 101716
OrangeCountyNC
>
Advisory Boards and Commissions - Active
>
Orange County Planning Board
>
Agendas
>
2016
>
OCPB agenda 101716
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/14/2018 12:23:46 PM
Creation date
3/14/2018 12:12:00 PM
Metadata
Fields
Template:
BOCC
Date
10/17/2016
Meeting Type
Regular Meeting
Document Type
Agenda
Document Relationships
OCPB minutes 101716
(Message)
Path:
\Advisory Boards and Commissions - Active\Orange County Planning Board\Minutes\2016
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
224
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Article 7: Subdivisions <br /> Section 7.4: Improvements and Performance Guarantees <br /> <br /> <br />Orange County, North Carolina – Unified Development Ordinance Page 7-5 <br /> <br />(C) In lieu of certification from a public agency, the Planning Director is authorized to accept <br />certification from the applicant’s licensed professional engineer or licensed professional <br />surveyor or other professional as authorized by the North Carolina General Statutes that <br />the improvements have been installed in accordance with all applicable standards. <br />7.4.4 Performance Guarantees <br />(A) Performance guarantees shall be required for the purpose of ensuring that <br />subdividers/19developers properly install all required subdivision improvements in a timely <br />manner, in accordance with approved plats and construction plans. <br />(B) The term of a performance guarantee shall not exceed two years. The Planning Director <br />may, for good cause and with the approval of the provider of the guarantee, grant <br />extensions of the term, with each such extension not to exceed one year. <br />(C) Performance guarantees must be in the form of a performance bond, irrevocable letter of <br />credit, or cash escrow account. The form of guarantee shall be determined by the <br />subdivider/developer. <br />(D) The performance guarantee shall be conditioned upon the performance of all work <br />necessary to complete the required subdivision improvements within the time period <br />specified at the time of preliminary plat or construction plan approval. <br />(E) The amount of the performance guarantee shall equal at least 125% of the estimated <br />cost, including project management costs, of the required improvements that have not <br />been installed by the time of final plat submittal. <br />(F) The estimated cost of required improvements, including project management costs, must <br />be itemized by improvement type and certified by the subdivider/developer’s licensed <br />professional engineer. In the case of minor subdivisions, the subdivider’s licensed <br />professional engineer or licensed professional surveyor may provide the itemized cost <br />estimate. Cost estimates shall be based on industry norms within Orange County. <br />(G) If a subdivider/developer fails to properly install required improvements within the term of <br />the guarantee, the guarantee will be deemed in default. In the case of default, the County <br />is authorized to use the guarantee funds to complete the required subdivision <br />improvements or to let a contract for installation of the required improvements. <br />(H) Once the conditions of the performance guarantee have been completed to the <br />satisfaction of the appropriate agencies and any required maintenance guarantee has <br />been provided in accordance with the provisions of this Ordinance, the guarantee shall <br />be released. <br />(I) All improvements shall be completed in accordance with the conditions associated with <br />the approved plat(s) and the applicable standards contained in this Article. No financial <br />guarantee may be released until all required certifications of completion have been <br />provided. <br />(J) Once all of the required improvements have been at least 50% certified, the financial <br />guarantee may be reduced by the ratio that the completed improvements bear to the total <br />improvements required. However, only one such reduction shall be permitted prior to <br />releasing the entire performance guarantee. <br />7.4.5 Maintenance of Required Improvements <br />Improvements installed as a requirement of subdivision approval shall be maintained by the <br />subdivider/developer until they are accepted for maintenance by NCDOT, a utility provider, the <br />individual homeowner, or a Home Owners’ or Property Owners’ association.: <br /> <br />19 Staff is attempting to standardize terminology. We use the term ‘subdividers’ and ‘developers’ interchangeably <br />but they can actually mean vastly different things. We are eliminating the use of the term ‘developer’ in Article 7 <br />and relying solely on ‘subdivider’. <br /> 170
The URL can be used to link to this page
Your browser does not support the video tag.