Browse
Search
OCPB agenda 090716
OrangeCountyNC
>
Advisory Boards and Commissions - Active
>
Orange County Planning Board
>
Agendas
>
2016
>
OCPB agenda 090716
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/14/2018 11:51:30 AM
Creation date
3/14/2018 11:48:51 AM
Metadata
Fields
Template:
BOCC
Date
9/7/2016
Meeting Type
Regular Meeting
Document Type
Agenda
Document Relationships
OCPB minutes 090716
(Message)
Path:
\Advisory Boards and Commissions - Active\Orange County Planning Board\Minutes\2016
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
69
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Article 5: Uses <br /> Section 5.5: Standards for Residential Uses <br /> <br /> <br /> <br />Orange County, North Carolina – Unified Development Ordinance Page 5-49 <br /> <br />(e) A temporary custodial care unit shall be required to connect to water, <br />wastewater, and electric utilities serving the principal structure on the <br />property. <br />(f) The Orange County Health Department, or the agency that provides <br />sanitary sewer and water services, shall approve water and wastewater <br />disposal facilities. <br />(g) All applicable state and local approvals and permits shall be procured <br />including, but not limited to, a zoning compliance permit, building <br />permits, and health department approval. <br />(h) Approval of the application shall not exceed one year. Annual renewal <br />shall require a new application and recertification from a licensed <br />physician stating the necessity of direct care. <br />(i) Any approved temporary custodial care unit shall be removed no later <br />than 180 days after the time the mentally or physically impaired <br />person(s) is no longer receiving care or is in need of assistance. If the <br />structure is needed for a different impaired person, the temporary <br />custodial care unit may continue to be used, subject to the requirements <br />of this Ordinance. <br />(j) The caregiver shall allow inspections of the property by the County at <br />times convenient to the caregiver, during reasonable hours, and upon <br />prior notice for compliance purposes. <br />(k) A permit for a temporary custodial care unit may be revoked by the <br />Planning Director due to failure of the applicant to comply with any of the <br />above provisions. <br />5.5.10 Multi-Family30 <br />(A) Standards for EDH-3 and EDH-4 Zoning Districts <br />(1) Multi-family uses are permitted in the EDH-3 and EDH-4 zoning districts only in <br />accordance with the following standards: <br />(a) The multi-family use is part of an overall site plan that includes at least <br />one other permitted Principal Use. <br />(i) The other permitted Principal Use(s) must be established prior <br />to, or concurrent with, the multi-family use(s). <br />(b) The square footage of the structure(s), or portion of structures, to be <br />utilized for multi-family dwellings does not exceed 25% of the total <br />square footage of all structures included on the overall site plan. <br />(c) The square footage of the structure(s), or portion of structures, to be <br />utilized for uses that are subject to square footage restrictions in the <br />pertinent zoning district(s), as detailed in Article 5 of this Ordinance, does <br />not exceed 50% of the total square footage of all structures included on <br />the overall site plan. <br />(a) The site plan must identify the square footage of each building by type of <br />use. <br />(b) A permitted Principal Use must be established on at least 50% of the <br />total square footage of structures on the site. <br /> <br />30 These standards are being proposed in order to allow for some by-right mixed-use projects in the Hillsborough <br />EDD while ensuring the scope of the overall project is not predominantly multi-family residential. Projects that <br />contain a greater percentage of multi-family residential could still be permitted through the MPD-CZ or CUD <br />process. <br /> 50
The URL can be used to link to this page
Your browser does not support the video tag.