Orange County NC Website
DocuSign Envelope ID: 2A12972A- 7D21- 4D74- AD4C- A79339548F21 <br />receptacles that was originally figured at the hog day board near the main service panel <br />structure will be done away with. <br />Alt.2- 315/18 Please add amount of $6,287.00 to relocate 200 amp sub panel from center <br />of pavilion to end near curbing. We will install additional wood boards on existing wood <br />structure to mount sub panel and new receptacle outlets which will be used for hog day. <br />We will install (16) 20 amp 120 volt GFI receptacles on dedicated circuits can wood <br />structure, receptacles will have in -use covers. Twelve of the sixteen 20 amp 120 volt GFl <br />receptacles that were originally figured at the hog day board near the main service panel <br />structure will be done away with. All remaining quoted work on pavilion will remain as <br />quoted and will be fed from this relocated sub panel. <br />Total: $ 40,308.00 <br />TOMMY LAWRENCE ELECTRICAL CONTRACTORS, INC. <br />AUTHORIZED SIGNATURE: WARREN TAYLOR DATE: 1/8118 <br />ACCEPTANCE OF PROPOSAL <br />SIGNATURE: DATE: <br />