Browse
Search
2018-079-E DEAPR - Tommy Lawrence Electrical Contractors Farmers Market Pavillion electrical improvements
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2010's
>
2018
>
2018-079-E DEAPR - Tommy Lawrence Electrical Contractors Farmers Market Pavillion electrical improvements
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/31/2018 4:19:30 PM
Creation date
3/13/2018 3:04:47 PM
Metadata
Fields
Template:
Contract
Date
3/6/2018
Contract Starting Date
3/6/2018
Contract Ending Date
5/18/2018
Contract Document Type
Agreement - Construction
Amount
$40,308.00
Document Relationships
2018-094-E DEAPR - Tommy Lawrence Electrical Contractors Farmers Market Pavillion electrical upgrades change order 1
(Message)
Path:
\Board of County Commissioners\Contracts and Agreements\General Contracts and Agreements\2010's\2018
R 2018-079 DEAPR - Tommy Lawrence Electrical Contractors Farmers Market Pavillion electrical improvements
(Attachment)
Path:
\Board of County Commissioners\Contracts and Agreements\Contract Routing Sheets\Routing Sheets\2018
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DocuSign Envelope ID: 2A12972A- 7D21- 4D74- AD4C- A79339548F21 <br />receptacles that was originally figured at the hog day board near the main service panel <br />structure will be done away with. <br />Alt.2- 315/18 Please add amount of $6,287.00 to relocate 200 amp sub panel from center <br />of pavilion to end near curbing. We will install additional wood boards on existing wood <br />structure to mount sub panel and new receptacle outlets which will be used for hog day. <br />We will install (16) 20 amp 120 volt GFI receptacles on dedicated circuits can wood <br />structure, receptacles will have in -use covers. Twelve of the sixteen 20 amp 120 volt GFl <br />receptacles that were originally figured at the hog day board near the main service panel <br />structure will be done away with. All remaining quoted work on pavilion will remain as <br />quoted and will be fed from this relocated sub panel. <br />Total: $ 40,308.00 <br />TOMMY LAWRENCE ELECTRICAL CONTRACTORS, INC. <br />AUTHORIZED SIGNATURE: WARREN TAYLOR DATE: 1/8118 <br />ACCEPTANCE OF PROPOSAL <br />SIGNATURE: DATE: <br />
The URL can be used to link to this page
Your browser does not support the video tag.