Browse
Search
2018-079-E DEAPR - Tommy Lawrence Electrical Contractors Farmers Market Pavillion electrical improvements
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2010's
>
2018
>
2018-079-E DEAPR - Tommy Lawrence Electrical Contractors Farmers Market Pavillion electrical improvements
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/31/2018 4:19:30 PM
Creation date
3/13/2018 3:04:47 PM
Metadata
Fields
Template:
Contract
Date
3/6/2018
Contract Starting Date
3/6/2018
Contract Ending Date
5/18/2018
Contract Document Type
Agreement - Construction
Amount
$40,308.00
Document Relationships
2018-094-E DEAPR - Tommy Lawrence Electrical Contractors Farmers Market Pavillion electrical upgrades change order 1
(Message)
Path:
\Board of County Commissioners\Contracts and Agreements\General Contracts and Agreements\2010's\2018
R 2018-079 DEAPR - Tommy Lawrence Electrical Contractors Farmers Market Pavillion electrical improvements
(Attachment)
Path:
\Board of County Commissioners\Contracts and Agreements\Contract Routing Sheets\Routing Sheets\2018
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DocuSign Envelope ID: 2A12972A- 7D21- 4D74- AD4C- A79339548F21 <br />NORTH CAROLINA <br />ORANGE COUNTY <br />CONSTRUCTION SERVICES <br />AGREEMENT UNDER $50,000 <br />THIS CONSTRUCTION AGREEMENT (hereinafter "Agreement " ), is made and entered <br />into this sixth day of March, 2018 by and between Orange County, North Carolina (hereinafter <br />the "Owner ") party of the first part; and Tommy Lawrence Electrical Contractors, Inc. <br />(hereinafter the "Contractor "), party of the second part; <br />WITNESSETH: <br />For the purpose and subject to the terms and conditions hereinafter set forth, the Owner <br />hereby contracts for the construction services of the Contractor, and the Contractor agrees to <br />provide the construction services to the Owner in accordance with the terms of this Agreement. <br />1. TERM AND MAXIMUM AMOUNT PAYABLE <br />Beginning and ending dates of contract: March 6, 2018 through May 18, 2018. The Project <br />Commencement Bate shall be March 12, 2018. Dollar Amount Not to Exceed: forty thousand <br />three hundred and eight dollars ($40,308) <br />2. SERVICES <br />Contractor agrees to provide the following construction services (the "Work "): - Trench and <br />install conduit and wire from service panel to 200 amp sub panel, trench and install conduit and <br />wire from sub panel to (7) brick columns for (7) 20amp 120 volt dedicated GFI receptacles and <br />(2) 50amp 1201250 volt receptacles on end columns. <br />- Locate existing wells and hand dig where necessary. <br />- Locate and cut into existing wire feeding shelter, install quacite box to make splices and <br />extend circuit to new sub panel. <br />- Install (6) 80 "six blade KICHLER bronze colored ceiling fans with LED light in place of <br />existing 52" five blade ceiling fans at wood structure. We will re -wire existing fan circuits with <br />two circuits for separate control of new light and fan and install two switches at wood column. <br />- Install (1) 4X6 treated post with (1) 50 amp 1201250 volt receptacle and (3) 20 amp 124 volt. <br />GFI receptacles, all with in -use covers. Trench and install conduit and wire from service panel to <br />receptacle outlets which will be installed near black bollards. Eliminate one of the two 50 amp <br />1.201250 volt receptacles. <br />- Relocate 200 amp sub panel from center of pavilion to end near curbing. Install additional <br />wood boards on existing wood structure to mount sub panel and new receptacle outlets which <br />will be used for hog day. Install (16) 20 amp 120 volt GFI receptacles on dedicated circuits on <br />wood structure, receptacles will have in -use covers. Twelve of the sixteen 20 amp 120 volt GFI <br />receptacles that were originally figured at the hog day board near the main service panel structure <br />will be done away with. All remaining quoted work on pavilion (separate contract) will remain as <br />quoted and will be fed from this relocated sub panel. <br />Contractor shall not sub - contract all or any part of the construction services provided for in <br />this Agreement without prior written approval of the Owner. Contractor shall be responsible for <br />all errors or omissions, in the performance of the Agreement. Contractor shall correct any and all <br />errors, omissions, discrepancies, ambiguities, mistakes or conflicts at no additional cost to <br />Owner. <br />Revised 10/17 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.