Browse
Search
2018-085 Planning - Moffat Pipe Rogers Road sewer expansion change order 2
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2010's
>
2018
>
2018-085 Planning - Moffat Pipe Rogers Road sewer expansion change order 2
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/7/2019 3:17:21 PM
Creation date
3/9/2018 10:33:49 AM
Metadata
Fields
Template:
Contract
Date
1/24/2018
Contract Starting Date
7/10/2017
Contract Ending Date
7/15/2018
Contract Document Type
Contract Amendment
Amount
-$133,933.03
Document Relationships
2018-116 Planning - Moffat Pipe Change Order #3
(Attachment)
Path:
\Board of County Commissioners\Contracts and Agreements\General Contracts and Agreements\2010's\2018
2018-535 Planning - Moffat Pipe change order 4
(Message)
Path:
\Board of County Commissioners\Contracts and Agreements\General Contracts and Agreements\2010's\2018
2018-612 Planning - Moffat Pipe change order 5
(Message)
Path:
\Board of County Commissioners\Contracts and Agreements\General Contracts and Agreements\2010's\2018
2018-720 Planning - Moffat Pipe amendment 6
(Message)
Path:
\Board of County Commissioners\Contracts and Agreements\General Contracts and Agreements\2010's\2018
2019-173 Planning - Moffat Pipe change order 8
(Message)
Path:
\Board of County Commissioners\Contracts and Agreements\General Contracts and Agreements\2010's\2019
2019-352 Planning - Moffat Pipe change order 5
(Message)
Path:
\Board of County Commissioners\Contracts and Agreements\General Contracts and Agreements\2010's\2019
R 2018-085 Planning - Moffat Pipe Rogers Road sewer extension change order 2
(Message)
Path:
\Board of County Commissioners\Contracts and Agreements\Contract Routing Sheets\Routing Sheets\2018
R 2018-612 Planning - Moffat Pipe change order 5
(Message)
Path:
\Board of County Commissioners\Contracts and Agreements\Contract Routing Sheets\Routing Sheets\2018
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
'a 70 ( 9i -6-0 <br />CHANGE ORDER <br />CHANGE ORDER NO.: 2 DATE: Jan 24, 2018 <br />Project: Historic Rogers Road Sewer Expansion Project <br />Contractor: Moffat Pipe, Inc. <br />Engineer /Architect: URS Corporation — North Carolina <br />CONTRACTOR is directed to make the following changes in the Contract Documents <br />Description: Revise the quantity of jack and bore pipe to be installed with corresponding change in unit <br />price in accordance with the Standard General Conditions of the Construction Contract, Section 00 57 00. <br />Install additional gate at the entry to the easement near the Orange County Animal Shelter. Remove <br />additional trees from the Glenbrooke HOA parcel, as well as the large 60 -inch oak tree located on Mr. <br />Dave Bellin's property near Outfall D. Provide additional sanitary sewer services to three additional <br />parcels, and remove sanitary sewer services from ten parcels (net change of 7 sanitary sewer service <br />removals). A more detailed breakdown of these changes can be found in Attachment A — Work Change <br />Directive Log. <br />The following line items shall be applied against the Section 00 41 44, Unit Price Contract Bid Form, <br />with changes in the estimated quantities for Item Nos. 4C, 10, 11, 17, and 29; and additional Item Nos. <br />10A, 33, and 34. <br />4C <br />8 -inch Diameter Epoxy <br />Linear Feet <br />+130 <br />$73.00 <br />$9,490.00 <br />18 <br />Coated Ductile Iron <br />Each <br />-1 <br />$5,000 <br />- $5,000 <br />29 <br />Sanitary Sewer Pipe, 10- <br />Each <br />+1 <br />$6,000.00 <br />$6,000.00 <br />33 <br />12 ft. depth <br />Lum Sum <br />1 <br />$1,500.00 <br />$1,500.00 <br />10 <br />16 -Inch Diameter Steel <br />Linear Feet <br />-220 <br />$800.00 <br />- $176,000.00 <br />Casin& Jack and Bore <br />10a <br />Revised 16 -inch Diameter <br />Linear Feet <br />78 <br />$937.56 <br />$73,129.68 <br />Steel Casing Jack and <br />Bore <br />11 <br />8 -Inch Diameter Epoxy <br />Linear Feet <br />-130 <br />$50.00 <br />- $6,500.00 <br />- <br />oate Ductile Iron <br />Sanitary Sewer Carrier <br />17 1 <br />Sanitary Sewer Service <br />via Open Cut <br />Each <br />-7 <br />$5,000 <br />- $35,000 <br />18 <br />Sanitary Sewer Service <br />via Dry Bore <br />Each <br />-1 <br />$5,000 <br />- $5,000 <br />29 <br />Gate <br />Each <br />+1 <br />$6,000.00 <br />$6,000.00 <br />33 <br />Glenbrooke Tree Removal <br />Lum Sum <br />1 <br />$1,500.00 <br />$1,500.00 <br />34 <br />Large 60" Oak Tree <br />Removal <br />Lump Sum <br />1 <br />$18,447.29 <br />$18,447.29 <br />Net Adjustment of this Change Order - $113,933 03 <br />
The URL can be used to link to this page
Your browser does not support the video tag.