Browse
Search
OCPB agenda 080316
OrangeCountyNC
>
Advisory Boards and Commissions - Active
>
Orange County Planning Board
>
Agendas
>
2016
>
OCPB agenda 080316
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/8/2018 12:14:48 PM
Creation date
3/8/2018 11:58:41 AM
Metadata
Fields
Template:
BOCC
Date
8/3/2016
Meeting Type
Regular Meeting
Document Type
Agenda
Document Relationships
OCPB minutes 080316
(Message)
Path:
\Advisory Boards and Commissions - Active\Orange County Planning Board\Minutes\2016
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
327
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> <br />1. The applicant shall place the area of the property encumbered by the SFHA Overlay <br />District, including required stream/floodplain buffers, into a Conservation Easement. This <br />easement shall be recorded within 180 days from approval of the application. <br />2. The applicant shall cause a formal and detailed landscape and tree preservation plan to <br />be submitted and approved by the Orange County Planning Department within 180 days <br />from the approval of this Special Use Permit. This plan shall also incorporate the <br />preservation of environmentally sensitive areas such as jurisdictional streams, wetlands <br />and floodplain. <br />3. The applicant shall cause a plat to be submitted recording all lease, access, utility and <br />conservation easements on the subject area. <br />4. The applicant complete and submit a formal application to the Orange County <br />Inspections Department requesting authorization to commence construction of the <br />proposed solar array. The application, including all applicable fees, shall be submitted <br />within 180 days from the approval of the Special Use Permit. <br />5. The Orange County Fire Marshal’s office shall review and approve the final site plan, as <br />part of the normal building permit review process, and that any and all modifications be <br />made to address fire code issues and access prior to the issuance of the permit <br />authorizing the commencement of land disturbing activities. <br />6. The applicant shall provide a detailed, scaled, map to the Orange County Fire Marshal’s <br />office and the Efland Volunteer Fire Department denoting the location of all storage <br />areas for batteries, master cut-off switches, and other similar devices to ensure the <br />protection of emergency responders in the event of a catastrophic incident on the <br />property. This map shall be submitted prior to the issuance of a Certificate of Occupancy <br />by the County allowing for operation of the facility to commence. <br /> <br />RECOMMENDATION: <br /> <br /> <br />Staff has not received any comments from local residents and property owners indicating they do not believe the <br />proposed facility complies with the provisions of Section 5.3.2 (A) (2) inclusive. These standards include <br />maintaining or promoting the public health, safety, and general welfare, maintaining or enhancing the value of <br />contiguous property, the use is in harmony with the area in which it is to be located, and the use being in <br />compliance with the general plan for the physical development of the County. <br /> <br />Staff has reviewed the application, the site plan, and all supporting documentation and has found that the <br />applicant complies with the specific standards and required regulations as outlined within the UDO with respect <br />to the submittal of required information for the project. <br /> <br />Provided the Planning Board finds in the affirmative on the specific and general standards as detailed herein, and <br />no evidence is entered into the record demonstrating the applicant has either: <br />a. Failed to meet their burden of proof that the project complies with the specific development standards for a <br />school; or <br />b. Fails to comply with the general standards detailed within Section 5.3.2 (A) (2) <br />of the UDO, the Board could make an affirmative recommendation on this application to the BOCC. <br />In the event that the Board makes an affirmative finding, staff recommends the attachment of the following <br />conditions: <br /> 167
The URL can be used to link to this page
Your browser does not support the video tag.