Orange County NC Website
<br />REQUIREMENT UDO SUPPORTING EVIDENCE Staff Planning <br />Board <br />Recomm <br />endation <br />STANDARDS for Solar Array – Public Utility <br />Site Plan <br />A site plan prepared in accordance <br />with Section 2.5 of and 5.9.6 (C) (1) <br />inclusive of UDO <br /> <br />5.9.6 (C) (1) <br />(a) through <br />(d) <br />Application, Applicant Testimony, <br />Staff Testimony, and Site Plan. <br /> <br />Site plan provides elevations for <br />proposed arrays, fencing and <br />landscaping. <br /> <br />The application, EA and Phase I <br />Environmental contain required <br />soils information and reports <br />(Attachment 1) <br /> <br />Yes <br /> <br />Standards of Evaluation <br /> <br /> <br />On-site utility and transmission <br />lines placed underground when <br />feasible <br /> <br />5.9.6 (C) (2) <br />(a) <br /> <br />Application, Applicant Testimony, <br />Staff Testimony, and Site Plan <br />(Attachments 1 and 2). <br /> <br />Yes <br /> <br />Height of array shall not exceed 40 <br />ft. <br /> <br />5.9.6 (C) (2) <br />(b) <br /> <br />Application, Applicant Testimony, <br />Staff Testimony, and Site Plan <br />(Attachments 1 and 2). <br />Yes <br /> <br />Individual arrays shall be designed <br />and located to prevent reflective <br />glare toward inhabited buildings on <br />adjacent property and rights-of- <br />way. <br />5.9.6 (C) (2) <br />(c) <br /> <br />Application, Applicant Testimony, <br />Staff Testimony, and Site Plan <br />(Attachments 1 and 2). <br />Yes <br />Warning signs concerning voltage. 5.9.6 (C) (2) <br />(d) <br /> <br />Application, Applicant Testimony, <br />Staff Testimony, and Site Plan <br />(Attachments 1 and 2). <br />Yes <br />Mechanical equipment and arrays <br />shall be enclosed by a minimum 8 <br />ft. high fence and screening per <br />Section 6.8 of UDO. <br /> <br />5.9.6 (C) (2) <br />(e) <br /> <br />Application, Applicant Testimony, <br />Staff Testimony, and Site Plan <br />(Attachments 1 and 2). <br />Yes <br />Proof of liability insurance – <br />minimum of $500,000.00 per <br />occurrence. <br /> <br />5.9.6 (C) (2) <br />(f) <br /> <br />Application and Applicant <br />Testimony (Attachment 1). <br /> <br />Yes <br />Type D land use buffer around <br />perimeter of project <br /> <br />5.9.6 (C) (2) <br />(g) <br /> <br />Application, Applicant Testimony, <br />Staff Testimony, and Site Plan <br />(Attachments 1 and 2). <br /> <br />Yes <br /> 163