Orange County NC Website
(1) Upon acceptance of a Concept Plan application, the Planning Director shall <br />schedule a Neighborhood Information Meeting (NIM) and mail notices of the <br />meeting to each owner of property within 500 one thousand feet of the property <br />proposed to be subdivided. <br />(2) Notices of the NIM shall be mailed by first class mail at least ten days prior to the <br />date of the meeting. <br />(3) The Planning Director shall place a sign on the affected property indicating the <br />total number of lots proposed, the date, time, and location of the NIM; and the <br />Planning Department telephone number. The sign shall be posted on the <br />affected property at least seven days prior to the NIM. The NIM shall be held a <br />minimum of 14 days prior to the Planning Board meeting at which the concept <br />plan is scheduled to be reviewed. <br />(4) At the NIM, the applicant shall be available to answer questions about the <br />proposed subdivision, and to receive comments from neighboring property <br />owners for the purpose of improving the proposed subdivision design. <br />(5) The Planning Director shall explain the subdivision approval process and shall <br />identify meeting dates of the Planning Board and Board of Commissioners at <br />which neighboring property owners may speak with regard to specific concerns <br />and/or issues. <br />(E) Planning Director Review Procedures <br />(1) The Planning Director shall prepare and submit a recommendation to the <br />Planning Board which shall include the following: <br />(a) A written analysis of the Concept Plan; <br />(b) The Concept Plan’s general compliance with the requirements of this <br />Ordinance, the Comprehensive Plan, and other applicable codes and <br />ordinances; and <br />(c) The comments of neighboring property owners expressed at the <br />Neighborhood Information Meeting. <br />(d) Which Development Option Plan is recommended for eventual <br />Preliminary Plat processing. <br />(2) The Planning Director shall be permitted to defer the application and <br />recommendation for one meeting beyond the Planning Board meeting at which <br />the application is scheduled to be heard. <br />(F) Planning Board Review and Approval Procedures <br />(1) After receiving the Planning Director’s report and recommendation, the Planning <br />Board shall consider the Concept Plans and take action on the proposals. <br />(2) The Planning Board shall base its action on its findings as to the conformity of <br />the proposals with all applicable regulations and shall: <br />(a) Approve one Development Option; <br />(b) Approve one Development Option subject to conditions; or <br />(c) Deny the Development Options. <br />(3) The Planning Board shall vote on whether the development should proceed as a <br />Conventional Development Option or as a Flexible Development Option. <br />(a) If that vote approves the Development Option recommended by the <br />Planning Director, the vote by the Planning Board is the final decision on <br />whether the development proceeds as a Conventional Development <br />Option or as a Flexible Development Option. <br /> 25