Browse
Search
OCPB agenda 010616
OrangeCountyNC
>
Advisory Boards and Commissions - Active
>
Orange County Planning Board
>
Agendas
>
2016
>
OCPB agenda 010616
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/8/2018 11:40:56 AM
Creation date
3/8/2018 11:37:01 AM
Metadata
Fields
Template:
BOCC
Date
1/6/2016
Meeting Type
Regular Meeting
Document Type
Agenda
Document Relationships
OCPB minutes 010616
(Message)
Path:
\Advisory Boards and Commissions - Active\Orange County Planning Board\Minutes\2016
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
83
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Applications to establish a CUD shall be submitted to the Planning Director and shall be <br />processed in accordance with the procedure(s) for: <br />(1) Zoning Atlas amendment (Section 2.8), <br />(2) Class A Special Use Permit (Section 2.7), and <br />(3) The provisions of this Section. <br />(C) Submittal Requirements <br />(1) In addition to the CUD application form, an applicant shall also submit the <br />following information: <br />(a) A site plan prepared in accordance with the provisions of Section 2.5 <br />including the following: <br />(i) A detailed description of the proposed use of property including <br />an outline of the proposed operational characteristics of the <br />proposed development, <br />(ii) A detailed traffic survey, regardless of the estimated number of <br />trips per day, prepared in accordance with all applicable North <br />Carolina Department of Transportation (NC DOT) requirements <br />or standards as well as Section 6.17 of this Ordinance, <br />(iii) The appropriate environmental document prepared in <br />accordance with Section 6.16; and <br />(iv) A landscape plan showing the location of on-site significant <br />trees; proposed screening, buffers, and landscaping; and any <br />proposed treatment of any existing natural features. <br />(b) A summary of utility services, including processing of wastewater. <br />(c) A schedule of construction of all elements of the proposal; and <br />(d) Any other information identified during the pre-application conference <br />deemed essential to demonstrate the project’s compliance with these <br />regulations. <br />(2) 26 copies of the application package required in (1) above shall be submitted by <br />the applicant. <br />(3) The Planning Board and/or Board of County Commissioners may request <br />additional information in order to evaluate and properly process the application <br />for a CUD. <br />(D) Neighborhood Information Meeting <br />(1) Before a Public Hearing may be held on an accepted application for a CUD, the <br />applicant is required to schedule, with the assistance of the Planning <br />Department, a minimum of one neighborhood information meeting. The purpose <br />of this meeting is to obtain surrounding property owner input and comments on <br />the proposed development project. <br />(2) The applicant shall obtain property owner mailing address information from the <br />Orange County Planning Department and shall mail certified notices of the <br />meeting date and time via first class mail to each property owner within one <br />thousand feet of the property for which a CUD has been requested. <br />(3) The notices shall be mailed a minimum of 14 days prior to the date of the <br />proposed Neighborhood Information Meeting. <br />(4) The applicant shall post a sign on the property advertising the date, place, and <br />time of the meeting a minimum of 10 days prior to the date of the meeting. <br /> 22
The URL can be used to link to this page
Your browser does not support the video tag.