Browse
Search
OCPB agenda 100715
OrangeCountyNC
>
Advisory Boards and Commissions - Active
>
Orange County Planning Board
>
Agendas
>
2015
>
OCPB agenda 100715
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/7/2018 4:16:47 PM
Creation date
3/7/2018 4:11:42 PM
Metadata
Fields
Template:
BOCC
Date
10/7/2015
Meeting Type
Regular Meeting
Document Type
Agenda
Document Relationships
OCPB minutes 100715
(Message)
Path:
\Advisory Boards and Commissions - Active\Orange County Planning Board\Minutes\2015
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
128
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
September 9, 2015 <br />Page 6 <br />Plan approved by the Orange County Board of Commissioners, you are <br />committing to building all the infrastructure up front; <br />A phase line now appears on sheet C3.0, with Phase 1 being the entrance <br />road and all lots west of the first intersection, and Phase 2 being the <br />remainder of the proposed lots. <br /> <br />2. Provide an Landscape and Lighting Plans to demonstrate compliance with <br />UDO Landscape requirements (e.g. street trees and between lot plantings) <br />and Lighting requirements; <br />A landscape and lighting plan, sheet C8.0 has been added to the <br />submittal set. The lighting portion consists only of a note stating that per <br />the UDO lighting shall be designed and provided by Duke Energy and that <br />they will submit the proper plans prior to construction of any light <br />fixtures. <br />3. Provide details and dimensions for the mail kiosk and bump out; and Provide at <br />note regarding signage for subdivision (e.g. "Signage for the development <br />shall comply with UDO Section 6.12: Signs"). <br />The draft NCDOT detail for a mail kiosk bump out on a public street is <br />now included on sheet D4.0. That is all that is available at this time. Prior <br />to construction, we will coordinate with NCDOT on the bump-out design if <br />they have not yet released a final detail. <br /> <br />4. Please reference comments in the attached email, dated July 23, 2015, by <br />Jeff Scouten of Orange County Solid Waste Management. <br />See comments below. <br /> <br /> <br />Orange County Solid Waste Management <br />1. Plan Sheet C1.0 (Cover Sheet) - Add the following standard OCSW notes: <br />[construction waste notes removed from comment for brevity] <br />The indicated notes have been added to the cover sheet. <br />2. Plan Sheet C3.0 (Site Plan) - The minimum radius for each of the 2 proposed cul-de- <br />sacs needs to be 43' 6" (effective 44') to the face of curb in order for the County's <br />recycling trucks to get around them without having to make backing movements <br />and/or 3 point turns. The radius as shown on the plan appears to be 35' to the face <br />of curb. <br />Per discussions with staff (and based on previously approved designs used in <br />Orange County), four 20’ wide public access shared drives (two at each cul-de- <br />sac) have been added to give Solid Waste’s trucks sufficient space to perform <br />a 3-point turn using those drives plus the standard NCDOT 35’ radius cul-de- <br /> 32
The URL can be used to link to this page
Your browser does not support the video tag.