Browse
Search
OCPB agenda 090215
OrangeCountyNC
>
Advisory Boards and Commissions - Active
>
Orange County Planning Board
>
Agendas
>
2015
>
OCPB agenda 090215
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/7/2018 4:08:53 PM
Creation date
3/7/2018 4:06:32 PM
Metadata
Fields
Template:
BOCC
Date
9/2/2015
Meeting Type
Regular Meeting
Document Type
Agenda
Document Relationships
OCPB minutes 090215
(Message)
Path:
\Advisory Boards and Commissions - Active\Orange County Planning Board\Minutes\2015
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
63
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
08/18/15 Page 2 of 2 <br />Michael Harvey Harts Mill: Major Subdivision <br />The adoption of consensus standards and integration into State codes is impossible to <br />predict but it is fair to say it could be years before the mentioned revision to NFPA 24 <br />paragraph 5.2.1 is adopted or even if it will be adopted as proposed. <br /> <br />Engineering has been assured by the Orange County Fire Marshal that, at the appropriate <br />time, his office will require fire-flow testing and hydraulic calculations to demonstrate <br />adequate flow at appropriate pressure for on-site private water mains supplying more than <br />one fire hydrant. While NFPA 24 doesn’t require a line size greater than 6” for private fire <br />service mains supplying private fire hydrants, as the authority having jurisdiction, the Fire <br />Marshal has in place construction standards that require the contractor to apply for a <br />construction permit for private fire hydrant installation. Such construction documents must <br />be submitted to the Fire Marshal’s office for review per section 105.7.11 of the NC Fire <br />Code. The Fire Marshal’s office will look at the proposed installation, analyze current fire <br />flow data from the existing system and compare water flow data with the projected <br />installation and see if it can meet the intended fire flow requirements of the structure(s) <br />serving the private property. If the current and designed system water flows are adequate <br />for the fire flow needs of the property being protected and it is supplied with a 6” line, there <br />is no need to require an 8” main. If the design does not meet the fire flow needs and that <br />need can only be provided by the water system, an increase in the size of fire protection <br />main servicing the private property would be required. <br /> <br />Engineering has reviewed the 07/31/15 letter from Michael M. Hughes, P.E. addressing the <br />recommendation by this division to provide an 8” main at least to the on-site first fire <br />hydrant. This division will continue to investigate, along with the Orange County Fire <br />Marshal, as to how Orange Alamance Water System (OWAS) can continue to add fire <br />hydrants to its system and yet claim that its’ principal mission is the provision of high-quality <br />potable water (only). That being said and having received assurances that our concerns as <br />to adequate fire flow and pressure will be enforced by the Orange County Fire Marshal’s <br />office, we have no objection to the subject property being rezoned to Major Planning <br />Development (MPD-CZ), as proposed. <br />33
The URL can be used to link to this page
Your browser does not support the video tag.