Browse
Search
OCPB agenda 070115
OrangeCountyNC
>
Advisory Boards and Commissions - Active
>
Orange County Planning Board
>
Agendas
>
2015
>
OCPB agenda 070115
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/7/2018 4:04:35 PM
Creation date
3/7/2018 4:00:52 PM
Metadata
Fields
Template:
BOCC
Date
7/1/2015
Meeting Type
Regular Meeting
Document Type
Agenda
Document Relationships
OCPB minutes 070115
(Message)
Path:
\Advisory Boards and Commissions - Active\Orange County Planning Board\Minutes\2015
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
96
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
protection of emergency responders in the event of a catastrophic incident on the <br />property. This map shall be submitted prior to the issuance of a Certificate of Occupancy <br />by the County allowing for operation of the facility to commence. <br />7. The applicant shall submit a Solid Waste Management application for the project within <br />180 days from the approval of the Special Use Permit. <br />8. That prior to the commencement of land disturbing activity the applicant shall submit all <br />necessary stormwater, grading plans, and erosion control applications to the Orange <br />County Erosion Control Department for review and processing. These applications shall <br />be submitted within 180 days from the issuance of the SUP. <br />9. That the applicant shall submit the approved site plan to NC DOT for review and <br />comment. In the event it is determined that the applicant is required to apply for, and <br />receive a, driveway permit from NC DOT to allow for the project to be developed, the <br />applicant shall submit all necessary applications as required by NC DOT within 180 days <br />from the issuance of the SUP and provide planning staff with a copy of the issued permit. <br />10. The Special Use Permit will automatically expire within 12 months from the date of <br />approval if the use has not commenced or construction has not commenced or <br />proceeded unless a timely application for extension of this time limit is approved by the <br />Board of Adjustment. <br />11. If any condition of this Special Use Permit shall be held invalid or void, then this Special <br />Use Permit shall be void in its entirety and of no effect. <br /> <br /> <br />86
The URL can be used to link to this page
Your browser does not support the video tag.