Orange County NC Website
<br />REQUIREMENT UDO SUPPORTING EVIDENCE Staff Planning <br />Board <br />STANDARDS for Solar Array – Public Utility (continued) <br />Decommissioning of solar facility 5.9.6 (C) (3) <br />(a) through <br />(f) inclusive <br />Application, Applicant Testimony, <br />Staff Testimony, and Site plan <br />(Sheet C1001 – Note 21). <br /> <br />Applicant acknowledges <br />requirement and agreed to the <br />condition in the event the use of <br />the site as a solar array – public <br />utility is ceased. <br /> <br />Yes <br /> <br />82