Browse
Search
OCPB agenda 070115
OrangeCountyNC
>
Advisory Boards and Commissions - Active
>
Orange County Planning Board
>
Agendas
>
2015
>
OCPB agenda 070115
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/7/2018 4:04:35 PM
Creation date
3/7/2018 4:00:52 PM
Metadata
Fields
Template:
BOCC
Date
7/1/2015
Meeting Type
Regular Meeting
Document Type
Agenda
Document Relationships
OCPB minutes 070115
(Message)
Path:
\Advisory Boards and Commissions - Active\Orange County Planning Board\Minutes\2015
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
96
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
applicant shall bear the burden of paying all fees associated with this inspection of the <br />wastewater treatment facility as imposed by the Health Department. <br />8. That the applicant secure any necessary Soil Erosion and Grading, Stormwater, or other <br />similar permit(s) from the Orange County Erosion Control Division, prior to any land <br />disturbing activity occurring as part of the approved site plan. <br />9. That the applicant adhere to any conditions that may be imposed by North Carolina <br />Department of Transportation in accordance with the driveway permit for this project. <br />10. That the provision of outdoor sports field lighting shall be deemed a SUP modification <br />requiring the applicant to apply for a new Class A Special Use Permit as detailed within <br />the UDO. <br />11. Development proposals shall be submitted to the North Carolina Division of Fish and <br />Wildlife for review comment as part of the site plan review process of the County to <br />ensure no endangered species are impacted. <br />12. The Special Use Permit will automatically expire in 12 months from the date of approval <br />if the use has not commenced or construction has not commenced or proceeded unless <br />a timely application for extension of this time limit is approved by the Board of <br />Adjustment. <br />13. If any condition of this Special Use Permit shall be held invalid or void, then this Special <br />Use Permit shall be void in its entirety and of no effect. <br /> <br /> <br />58
The URL can be used to link to this page
Your browser does not support the video tag.