Browse
Search
OCPB agenda 070115
OrangeCountyNC
>
Advisory Boards and Commissions - Active
>
Orange County Planning Board
>
Agendas
>
2015
>
OCPB agenda 070115
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/7/2018 4:04:35 PM
Creation date
3/7/2018 4:00:52 PM
Metadata
Fields
Template:
BOCC
Date
7/1/2015
Meeting Type
Regular Meeting
Document Type
Agenda
Document Relationships
OCPB minutes 070115
(Message)
Path:
\Advisory Boards and Commissions - Active\Orange County Planning Board\Minutes\2015
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
96
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />REQUIREMENT UDO SUPPORTING EVIDENCE Staff Planning <br />Board <br />SPECIFIC STANDARDS <br />In accordance with Section 5.3.2 (A) (2), the Planning Board shall also consider the following general <br />conditions before the application for a Special Use can be approved. <br /> <br />NOTE: Planning Staff does not provide a recommendation on these items as the Board is expected to provide <br />a recommendation based on the sworn testimony provided at the hearing. Staff is providing a brief synopsis of <br />the information contained within the submittal the applicant argues demonstrates compliance for reference <br />purposes only. <br /> <br />The use (will / will not) maintain or <br />promote the public health, safety and <br />general welfare, if located where <br />proposed and developed and <br />operated according to the plan as <br />submitted. <br /> <br />Section 5.3.2 <br />(A) (2) (a) <br /> <br />Application package and <br />testimony including: <br />• Biological Inventory <br />completed by The Catena <br />Group; <br />• Forest Stewardship Plan <br />completed by Kelly <br />Douglass; <br />• Impact Analysis completed <br />by Everett ‘Vic’ Knight <br />• Transportation Impact <br />Analysis (TIA) completed by <br />SEPI Engineering <br />• State Clearing House <br />comments (Attachment 2 <br />July 1, 2015 Planning Board <br />packet) <br />Staff testimony and abstract <br />package from May 26, 2015 <br />quarterly public hearing. <br /> <br /> <br />The use (will / will not) maintain or <br />enhance the value of contiguous <br />property (unless the use is a public <br />necessity, in which case the use <br />need not maintain or enhance the <br />value of contiguous property). <br /> <br />Section 5.3.2 <br />(A) (2) (b) <br /> <br />Application package and <br />testimony including: <br />• Impact Analysis completed <br />by Everett ‘Vic’ Knight <br />Staff testimony and abstract <br />package from May 26, 2015 <br />quarterly public hearing. <br /> <br /> <br /> <br /> <br /> <br /> <br />55
The URL can be used to link to this page
Your browser does not support the video tag.