Browse
Search
OCPB agenda 070115
OrangeCountyNC
>
Advisory Boards and Commissions - Active
>
Orange County Planning Board
>
Agendas
>
2015
>
OCPB agenda 070115
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/7/2018 4:04:35 PM
Creation date
3/7/2018 4:00:52 PM
Metadata
Fields
Template:
BOCC
Date
7/1/2015
Meeting Type
Regular Meeting
Document Type
Agenda
Document Relationships
OCPB minutes 070115
(Message)
Path:
\Advisory Boards and Commissions - Active\Orange County Planning Board\Minutes\2015
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
96
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />REQUIREMENT UDO SUPPORTING EVIDENCE Staff Planning <br />Board <br />STANDARDS for Schools (Elementary, Middle and Secondary) – continued <br /> <br />Solid Waste Management <br /> <br />5.8.4 (A) (3) <br />(h) <br /> <br />Application, Applicant Testimony, <br />Staff Testimony (Attachment 3 of <br />quarterly public hearing packet), <br />and Site plan <br /> <br />A recommended condition of <br />approval is as new site plans are <br />submitted the applicant will submit <br />the formal solid waste <br />management plan for approval by <br />Orange County Solid Waste. <br /> <br />Yes <br /> <br />Irrigation <br /> <br />5.8.4 (A) (3) <br />(i) <br /> <br />Application and site plan Yes <br /> <br />Habitat Maintenance <br /> <br />5.8.4 (A) (3) <br />(j) <br /> <br />Application and site plan Yes <br /> <br />Public Road Access <br /> <br />5.8.4 (A) (3) <br />(k) <br /> <br />Application and site plan; <br />Transportation Impact Analysis <br />(TIA) completed by SEPI <br />Engineering <br /> <br />Yes <br /> <br />Maintenance of Improvements <br /> <br />5.8.4 (A) (3) <br />(l) <br /> <br />Application and site plan Yes <br /> <br />Additional Standards <br />i. Minimum lot size consistent <br />with adopted County school <br />construction standards. <br />ii. Lot size shall be adequate to <br />accommodate all activities. <br />iii. Negative visual impacts shall <br />be minimized along major <br />roadways. <br />iv. Required transportation <br />improvements are installed. <br />v. Site designed for multiple <br />shared use opportunities. <br />vi. Site access <br /> <br />5.8.4 (A) (3) <br />(m) <br /> <br />Application package including: <br />• Biological Inventory <br />completed by The Catena <br />Group; <br />• Forest Stewardship Plan <br />completed by Kelly <br />Douglass; <br />• Impact Analysis completed <br />by Everett ‘Vic’ Knight <br />• Transportation Impact <br />Analysis (TIA) completed <br />by SEPI Engineering <br />• State Clearing House <br />comments (Attachment 2 <br />July 1, 2015 Planning <br />Board packet) <br />Applicant and staff testimony. <br /> <br />Yes <br /> <br />54
The URL can be used to link to this page
Your browser does not support the video tag.