Browse
Search
OCPB agenda 070115
OrangeCountyNC
>
Advisory Boards and Commissions - Active
>
Orange County Planning Board
>
Agendas
>
2015
>
OCPB agenda 070115
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/7/2018 4:04:35 PM
Creation date
3/7/2018 4:00:52 PM
Metadata
Fields
Template:
BOCC
Date
7/1/2015
Meeting Type
Regular Meeting
Document Type
Agenda
Document Relationships
OCPB minutes 070115
(Message)
Path:
\Advisory Boards and Commissions - Active\Orange County Planning Board\Minutes\2015
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
96
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />REQUIREMENT UDO SUPPORTING EVIDENCE Staff Planning <br />Board <br />SPECIFIC STANDARDS <br />Waste Disposal <br />Method and adequacy of provision <br />for sewage disposal facilities, solid <br />waste and water service. <br />5.3.2(B)(1) May 26, 2015 Quarterly Public <br />Hearing Abstract (Attachment 3) <br />and staff testimony. <br />Both Environmental Health and <br />Solid Waste have indicated they <br />have no concerns. <br />Conditions are recommended to <br />require Solid Waste Permit as <br />part of development process. <br /> <br />Yes <br />Safety <br />Method and adequacy of police, <br />fire and rescue squad protection. <br />5.3.2(B)(2) May 26, 2015 Quarterly Public <br />Hearing Abstract (Attachment 3) <br />and staff testimony. <br />Orange County Emergency <br />Service staff and the Sheriff’s <br />office have indicated the project <br />can be served. <br /> <br />Yes <br /> <br /> <br /> <br /> <br /> <br />Vehicle Access <br />Method and adequacy of vehicle <br />access to the site and traffic <br />conditions around the site. <br />5.3.2(B)(3) May 26, 2015 Quarterly Public <br />Hearing Abstract (Attachment <br />3), Transportation Impact <br />Analysis (TIA) completed by <br />SEPI Engineering, and staff <br />testimony. <br />There will not be an appreciable <br />traffic increase in the area <br />associated with the expansion of <br />the school. <br /> <br />Yes <br />51
The URL can be used to link to this page
Your browser does not support the video tag.