Browse
Search
OCPB agenda 070115
OrangeCountyNC
>
Advisory Boards and Commissions - Active
>
Orange County Planning Board
>
Agendas
>
2015
>
OCPB agenda 070115
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/7/2018 4:04:35 PM
Creation date
3/7/2018 4:00:52 PM
Metadata
Fields
Template:
BOCC
Date
7/1/2015
Meeting Type
Regular Meeting
Document Type
Agenda
Document Relationships
OCPB minutes 070115
(Message)
Path:
\Advisory Boards and Commissions - Active\Orange County Planning Board\Minutes\2015
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
96
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />REQUIREMENT UDO SUPPORTING EVIDENCE Staff Planning <br />Board <br />APPLICATION COMPONENTS <br />Proper forms 2.2 Application (Attachment 1 of May <br />26, 2015 quarterly public hearing <br />packet) <br /> <br />Yes <br />Fees paid 2.2.4(D) Staff Testimony/Application <br />Yes <br /> <br />Full description of use <br />• Location <br />• Appearance <br />• Operational characteristics <br /> <br />2.7.3(B)(1) Application <br />Yes <br /> <br />Owner Information 2.7.3(B)(2) Application <br /> <br />Yes <br />Information needed for Use <br />Standards <br /> <br />2.7.3(B)(3) Application and site plan <br /> <br /> <br />Yes <br /> <br />Site Plans <br />(26 for Class A) <br /> <br />2.7.3(B)(4) Application/Staff Testimony (Site <br />plan) <br /> <br />Yes <br /> <br />Preliminary Subdivision Plat (if <br />necessary) <br /> <br />2.7.3(B)(5) [No subdivision proposed.] N/A <br />List of parcels within 500 feet <br /> <br />2.7.3(B)(6) Application Yes <br />Elevations of all structures 2.7.3(B)(7) Application and site plan; staff <br />testimony and pictures as part of <br />power point presentation <br /> <br />Yes <br />Environmental Assessment (or <br />EIS) <br />• Topography <br />• Drainage issues <br />• Natural or Cultural <br />resources <br />• Mining <br />• Hazardous Wastes <br />• Wastewater treatment <br />• Water usage <br /> <br />2.7.3(B)(8) Application package including: <br />• Biological Inventory <br />completed by The Catena <br />Group; <br />• Forest Stewardship Plan <br />completed by Kelly <br />Douglass; <br />• Impact Analysis completed <br />by Everett ‘Vic’ Knight <br />• State Clearing House <br />comments (Attachment 2 <br />July 1, 2015 Planning <br />Board packet) <br /> <br />Yes <br />Method of Debris Disposal <br /> <br />2.7.3(B)(9) Application and site plan Yes <br />Development Schedule <br /> <br />2.7.3(B)(10) Application and site plan Yes <br />Extended Vesting Request <br /> <br />2.7.3(B)(11) Not requested N/A <br />49
The URL can be used to link to this page
Your browser does not support the video tag.