Browse
Search
OCPB agenda 070115
OrangeCountyNC
>
Advisory Boards and Commissions - Active
>
Orange County Planning Board
>
Agendas
>
2015
>
OCPB agenda 070115
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/7/2018 4:04:35 PM
Creation date
3/7/2018 4:00:52 PM
Metadata
Fields
Template:
BOCC
Date
7/1/2015
Meeting Type
Regular Meeting
Document Type
Agenda
Document Relationships
OCPB minutes 070115
(Message)
Path:
\Advisory Boards and Commissions - Active\Orange County Planning Board\Minutes\2015
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
96
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
to use it could open the gate to use it. 1 <br /> 2 <br />Laura Rohrbacher: What about delivery trucks? 3 <br /> 4 <br />Tom Heffner: FedEx will be encouraged to use the subdivision streets rather than the private road. 5 <br /> 6 <br />Pete Hallenbeck: Is that road going to be taken off the GIS system as a road that segment there? If you don’t it would 7 <br />show up for emergency responders as a valid route they could take. 8 <br /> 9 <br />Craig Benedict: Probably addressing off that road and emergency services has a point on Erwin Road where they 10 <br />expect to see that road. They will have an asterisk on it because of what has happened around it but my thought 11 <br />process is that if the address is off that road indicate the point of entry for those lots, it will remain on the GIS system. 12 <br /> 13 <br />Pete Hallenbeck: They are currently switching to a system of closely dispatch that looks for all possible roads and 14 <br />routes and there is no mechanism to show if the road is full access or not. 15 <br /> 16 <br />Michael Harvey: You will probably see that occur if the project is approved and recorded. This will remain as an 17 <br />easement (Mr. Harvey was pointing to a map of the identified easement area) but the road name will be removed. 18 <br /> 19 <br />Paul Guthrie: On the open space buffering outside the lot, what is going to be the legal long-term ownership and legal 20 <br />responsibility for that property? 21 <br /> 22 <br />Tom Heffner: It would be owned by a homeowner’s association as incorporated body. Their legal documents would 23 <br />require their ownership and their maintenance of the property and then in turn there would be homeowner’s dues paid 24 <br />by the people living in the subdivision that would fund that work on an ongoing basis. 25 <br /> 26 <br />Michael Harvey: If this is approved with a flexible development layout, there will be provisions in the resolution of 27 <br />approval as there are in all major subdivision based on the flexibility and design guidelines to preclude the clearing of 28 <br />the trees within the dedicated open space except for any activity recognized by the board such as the installation of a 29 <br />trial or recreation area. 30 <br /> 31 <br />Paul Guthrie: My question was about long term liability and things that take place on that and the ability or not of that 32 <br />being removed from open space. 33 <br /> 34 <br />Michael Harvey: This area could not be removed from open space unless the applicant came back to the county to 35 <br />request a modification of the major subdivision. I will state that we would probably object to it being removed because 36 <br />that is how it was originally approved and we are not interested in seeing dedicated open space turned into developed 37 <br />area. 38 <br /> 39 <br />James Lea: Does Lot 9 actually take up part of the pond? 40 <br /> 41 <br />Tom Heffner: Yes. The pond size will be modified. Since it is not a spring fed pond, in the summer when we have less 42 <br />rain, it drops significantly so my goal is that we will reduce the physical area of the pond to try to have a more stable 43 <br />water level. The line is showing the maximum size of the pond. 44 <br /> 45 <br />James Lea: What happens when you have flooding with the pond? 46 <br /> 47 <br />Tom Heffner: Earth Centric engineering is doing storm water plan we have had several meetings on how to handle 48 <br />that. We can increase the storm water flow downstream to the properties over to the right. We are trying to utilize the 49 <br />12
The URL can be used to link to this page
Your browser does not support the video tag.