Orange County NC Website
• Second Action – The Planning Board reviews and takes action on the Concept <br />Plan application approving either the ‘conventional’ or ‘flexible development’ layout. <br />The Planning Board review begins on June 3, 2015. As a reminder, the Concept <br />Plan review is intended to allow Board members and the applicant to discuss the <br />nature of the project and identify possible solutions to concerns identified by staff or <br />surrounding property owners. <br />If approved the Concept Plan serves as a ‘roadmap’ for the developer with respect <br />to the acceptable lot and road layout as well as location of proposed/required open <br />space and recreation areas. <br />• Third Action – Once a concept plan is approved, the Planning Board reviews and <br />makes a recommendation on the approval of the Preliminary Plat for the project. <br />• Fourth Action – The BOCC reviews and takes action on the Preliminary Plat <br />application. <br />• Fifth Action – Once all construction activities have been completed, or appropriate <br />bonds have been approved, staff will sign off and allow the recordation of a Final <br />Plat allowing for the individual lots to be created. <br /> <br />Proposal: The petitioner has submitted a Major Subdivision Concept Plan application proposing to <br />develop a maximum of 19 single-family residential lots with an overall proposed density for the <br />project of 1 dwelling unit per every 2.52 acres of land area with approximately 21 acres of the site <br />dedicated as common open space. Lots range in size from 1.0 (smallest) to 1.68 acres (largest). <br /> <br />UDO and Joint Planning Land Use Plan Requirements: Per Section 2.15.2 (C) (2) (b) of the UDO, <br />major subdivision concept plan applications are required to submit both a conventional and flexible <br />development option. <br /> <br />The flexible development option involves the preservation of a minimum 33% of the total tract’s land <br />area as protected open space. Development of individual lots is then allowed consistent with three <br />‘flexible development’ subdivision classifications detailed within Article 7 Subdivisions of the UDO, <br />namely: <br />• Estate Lot Option: Characterized by lots having a minimum area of 4 acres where the <br />building envelope does not exceed 50% of the total lot area. <br />• Conservation Cluster Option: Characterized by lots clustered together with a potential <br />minimum lot area of 40,000 square feet. Allowable lot yield is based on compliance with <br />density limits denoted within Section 4.2.4 of the UDO and as found in Section 6 of the Joint <br />Planning Land Use Plan. This Cluster Option was amended in 2013-14 to allow for smaller <br />lot sizes so long as the density did not increase and a proportional amount of common open <br />space was provided. <br />• Village Option: Allows for mixed-use development including various residential options (i.e. <br />single-family, multi-family, townhome, etc.) as well as public/civic areas and non-residential <br />development. This option is expressly prohibited within the RB zoning district as detailed <br />within Section 7.13.2 (C) of the UDO. <br />Clustering of lots may be permitted as outlined within the UDO as well as in Section 6, Future Land <br />Use – Joint Planning Area of the Joint Planning Land Use Plan, which can be viewed utilizing the <br />following link: http://orangecountync.gov/planning/documents/JPALUPDocument.pdf <br /> <br />7