Orange County NC Website
COMPREHENSIVE PLAN / FUTURE LAND USE MAP <br />AND <br />UNIFIED DEVELOPMENT ORDINANCE (UDO) <br />AMENDMENT OUTLINE <br /> <br />UDO / Zoning-2015-02 <br />UDO Text Amendment(s) allowing for the modification of impervious surface area <br />within Watershed Protection Overlay Districts through the installation of an infiltration <br />based stormwater system <br />A. AMENDMENT TYPE <br />Map Amendments <br /> Land Use Element Map: <br />From: <br />To: <br /> Zoning Map: <br />From: <br />To <br /> Other: <br /> <br />Text Amendments <br /> Comprehensive Plan Text: <br />Section(s): <br /> <br /> UDO Text: <br />UDO General Text Changes <br />UDO Development Standards <br />UDO Development Approval Processes <br />Section(s): 1. 4.2.8 Modifications of the Impervious Surface Ratio <br />of the Orange County Unified Development Ordinance (UDO). <br /> <br /> <br /> Other: <br /> <br />B. RATIONALE <br />1. Purpose/Mission <br />In accordance with the provisions of Section 2.8 Zoning Atlas and Unified <br />Development Ordinance Amendments of the UDO, the Planning Director has <br />initiated text amendment(s) to modify existing regulations governing processes <br />Attachment 1 45