Browse
Search
OCPB agenda 040115
OrangeCountyNC
>
Advisory Boards and Commissions - Active
>
Orange County Planning Board
>
Agendas
>
2015
>
OCPB agenda 040115
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/7/2018 3:56:44 PM
Creation date
3/7/2018 3:53:18 PM
Metadata
Fields
Template:
BOCC
Date
4/1/2015
Meeting Type
Regular Meeting
Document Type
Agenda
Document Relationships
OCPB minutes 040115
(Message)
Path:
\Advisory Boards and Commissions - Active\Orange County Planning Board\Minutes\2015
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
76
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Article 2: Procedures <br /> Section 2.5: Site Plan Review <br /> <br />(T) Phase lines and numbers if the development is to be phased; <br />(U) Methods of disposal of trees, limbs, stumps and construction debris associated with the <br />permitted activity. Open burning of trees, limbs, stumps, and/or construction debris <br />associated with the permitted activity is expressly prohibited; <br />(V) Compliance with County adopted access management, transportation and/or connectivity <br />plans and denote the location of future roadway(s) and access easements, whether <br />public or private, to ensure and encourage future connectivity; and <br />(W) Additional information may be required based on the site location and the type of <br />development proposed. <br />2.5.4 Procedures and Timeframes <br />(A) Upon submission, the Planning Director shall review the site plan application for <br />completeness in form and content according to this Article. <br />(B) If an application is incomplete, it will be returned to the applicant within five working days. <br />(C) When a complete application has been accepted, the plan(s) shall be distributed to <br />applicable agencies, DAC, and other departments for review and comment. <br />(1) Applications for agricultural support enterprise uses located within the Rural <br />Buffer land use classification, as depicted on the Future Land Use Map of the <br />adopted Comprehensive Plan, shall be forwarded to the County’s Agricultural <br />Preservation Board for review and comment. <br />(a) The Agricultural Preservation Board shall have 30 calendar days to <br />provide comments. If comments are not received within this timeframe, <br />the application review process shall not be delayed. <br />(b) For purposes of this subsection, agricultural support enterprise uses <br />shall be defined as those permitted in the ASE-CZ zoning district, as <br />detailed within Section 5.2.3 of this Ordinance.1 <br />(D) The Planning Director shall review the plan(s) based on, but not limited to, the following <br />general criteria: <br />(1) Compliance with all applicable County ordinances; <br />(2) Extent and intensity of impacts to the surrounding area; <br />(3) Respect for existing site conditions, including slope, vegetation, drainage <br />patterns, etc.; <br />(4) Efficient use of the land to minimize disturbance and grading and to conserve <br />energy; <br />(5) Safe and efficient vehicular and pedestrian circulation; <br />(6) Logical placement of structures and other site functions; <br />(7) No open burning of trees, limbs, stumps and construction debris associated with <br />the permitted activity; and <br />(8) Compliance with any previously issued Special Use or Conditional Use Permit(s) <br />associated with the project. <br />1 This section is being added in response to Town of Carrboro and Chapel Hill recommendations that the <br />Agricultural Preservation Board be given the opportunity to review and comment on any applications in the Rural <br />Buffer. Planning staff is recommending a 30 day comment period to ensure that the review/approval process for <br />uses permitted by right does not become overly lengthy. However, the APB generally meets only every other <br />month so a special meeting may need to be called to review any applications. <br /> <br />Orange County, North Carolina – Unified Development Ordinance Page 2-11 <br /> <br /> <br />22
The URL can be used to link to this page
Your browser does not support the video tag.