Browse
Search
OCPB agenda 020415
OrangeCountyNC
>
Advisory Boards and Commissions - Active
>
Orange County Planning Board
>
Agendas
>
2015
>
OCPB agenda 020415
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/7/2018 3:49:38 PM
Creation date
3/7/2018 3:47:19 PM
Metadata
Fields
Template:
BOCC
Date
2/4/2015
Meeting Type
Regular Meeting
Document Type
Agenda
Document Relationships
OCPB minutes 020415
(Message)
Path:
\Advisory Boards and Commissions - Active\Orange County Planning Board\Minutes\2015
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
60
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Efland Area Resident Group Input/Suggestions for each Proposed Standard is in the Column on the Right <br />Efland Interstate Overlay District <br />Easy <br />Ref. <br />No. <br />Section <br />Number in UDO <br />Revisions <br />Proposed Standard Efland Area Resident Group Input/Suggestion <br />1. 4.5.3 (B)(1) The minimum side and rear setback shall be with width of the <br />required buffer in 6.6.3(B) or the setback required in Article 3 <br />or Section 6.2.8, whichever is less, except as provided in (a). <br />OK as is <br />2. 4.5.3(B)(1)(a) (Referenced in standard above) <br />For parcels subject to the setback and yard requirements in <br />Section 4.7.4, the requirements of said Section shall apply. <br />OK as is <br />3. 4.5.3(B)(2) Where applicable, the front yard setback shall be measured <br />from any future right-of-way as designated on the Orange <br />County Thoroughfare Comprehensive Transportation Plan. <br />Delete this requirement. It can be added in the future <br />if necessary if/when a Comprehensive Transportation <br />Plan that includes future right-of-way designations is <br />adopted. <br />4. 6.6.3(A)(1) <br />(A) is <br />“Circulation and <br />Connectivity” <br />All site planning for property east of Mount Willing Road shall <br />take into account the need for a connecting roadway between <br />Mount Willing Road and the Interstate 85/U.S. Highway 70 <br />Connector. <br />OK as is <br />5. 6.6.3 (A)(2) All site planning west of Mount Willing Road shall take into <br />account: <br />(a) A possible re-alignment of Efland-Cedar Grove Road under <br />the existing railroad track to connect to Mount Willing Road, as <br />described in the adopted Efland-Mebane Small Area Plan. <br />(b) The need for a connecting roadway between Mount Willing <br />Road and Buckhorn Road, as depicted on the Efland-Buckhorn- <br />Mebane Access Management Plan, adopted November 11, <br />2011. <br />The possible realignment of Efland-Cedar Grove Road <br />under the existing railroad track should be removed <br />from the adopted Access Management Plan and <br />proposed standard (a) should be deleted from the <br />proposed UDO amendment. <br />6. 6.6.3 (A)(3) In order to manage access on public streets, a site shall be <br />permitted no more than one entrance/exit point unless <br />justified by site configuration, trip generation, and traffic <br />conditions, including the need for separate service and <br />visitor/employee vehicular access, and/or one-way traffic <br />movement. <br />Rewrite as follows: In order to manage access on public <br />streets, a site shall be permitted no more than one <br />entrance/exit point unless justified by site <br />configuration, trip generation, and traffic conditions, <br />including the need for separate service and <br />visitor/employee vehicular access, and/or one-way <br />traffic movement, or other factors. <br />Page 1 of 17 <br />January 26, 2015 <br />43
The URL can be used to link to this page
Your browser does not support the video tag.