Orange County NC Website
Approved 7/2/14 <br />1 <br /> <br /> <br /> MINUTES <br />ORANGE COUNTY PLANNING BOARD JUNE 4, 2014 REGULAR MEETING <br /> <br />MEMBERS PRESENT: Peter Hallenbeck (Chair), Cheeks Township Representative; Lisa Stuckey, Chapel Hill <br />Township Representative; Maxecine Mitchell, At-Large Bingham Township; Herman Staats, At-Large, Cedar Grove <br />Township; Buddy Hartley, Little River Township Representative; Tony Blake, Bingham Township Representative; <br />Andrea Rohrbacher, At-Large Chapel Hill Township; James Lea, Cedar Grove Township Representative; Laura <br />Nicholson, Eno Township Representative; Bryant Warren, Hillsborough Township Representative; <br /> <br />MEMBERS ABSENT: Paul Guthrie, At-Large Chapel Hill Township; Vacant-At-Large; <br /> <br /> <br />STAFF PRESENT: Craig Benedict, Planning Director; Michael Harvey, Current Planning Supervisor; Patrick Mallett, <br />Planner II; Tina Love, Administrative Assistant II <br /> <br /> <br />OTHERS PRESENT: Terry Boylan, Glenn Futrell <br /> <br /> <br />AGENDA ITEM 7: MAJOR SUBDIVISION CONCEPT PLAN: To review and make a decision on an major subdivision <br />concept plan application seeking to sub-divide a 25.33 acre parcel of property into 14 single- <br />family residential lots with 16.29 acres of common open space near the intersection of <br />Stroud’s Creek Road and NC Highway 57 in Hillsborough Township. Presenter: Patrick Mallett, Planner II <br /> <br />Patrick Mallett: Presented a PowerPoint presentation and reviewed abstract. <br /> <br />James Carter: Where is that fence and will it remain there? <br /> <br />Patrick Mallett: That was installed by the school. <br /> <br />Michael Harvey: As covered in our abstract, one of the reasons you are seeing lots of this size is because water and <br />sewer service is being provided. That is the only way this project was allowed to get these smaller lots, which is in <br />accordance with the provisions of Article 7. The other comment is that you will recall previous major subdivisions, <br />applications are typically required to submit a conventional and flexible development options. <br /> <br />Pete Hallenbeck: There is a power line easement and it goes and disappears. Is there a power line in that easement <br />now? <br /> <br />Pat Mallett: There is a power line that goes through here and extends north. <br /> <br />Pete Hallenbeck: Currently the power line does not go through. <br /> <br />Terry Boylan: It does not go through. That is a tree line from when it did before. <br /> <br />Pete Hallenbeck: What about the dual water line fees? <br />Attachment 4 – Excerpt of <br />Approved June 4, 2014 Planning <br />Board Minutes <br />90