Orange County NC Website
Development Process, Schedule, and Action: The typical cadence for the review of a major <br />subdivision is as follows: <br />• First Action – Planning staff schedules a Neighborhood Information Meeting (NIM) <br />and invites property owners within 500 feet of the project to attend the meeting in <br />order to review the project with the applicant. <br /> Staff Comment – DONE. This meeting was held on January 14, 2014. <br />• Second Action – The Planning Board reviews and takes action on the Concept <br />Plan application approving either the ‘conventional’ or ‘flexible development’ layout. <br /> Staff Comment – DONE. The Planning Board met on February 5, 2014 and <br />approved the Concept Plan Flexible Design Option. Agenda materials for this <br />meeting can be viewed at: <br /> http://orangecountync.gov/planning/documents/2.5.14PBPacket.pdf <br /> Minutes from this meeting are contained in Attachment 4. <br />• Third Action – Once a concept plan is approved, the Planning Board reviews and <br />makes a recommendation on the approval of the Preliminary Plat for the project. <br /> Staff Comment –The Planning Board will review the Preliminary Plat at its <br />September 3, 2014 regular meeting. <br />• Fourth Action – The BOCC reviews and take action on the Preliminary Plat <br />application. <br />• Fifth Action – Once all construction activities have been completed, or appropriate <br />bonds have been approved, staff will sign off and allow the recordation of a Final <br />Plat allowing for the individual lots to be created. <br />Proposal: The petitioner has submitted a Major Subdivision Preliminary Plat application package, <br />consistent with the approved Concept Plan, proposing to develop a Conservation Cluster Flexible <br />Development Subdivision with 16 single-family residential lots at a gross density of 1 dwelling unit <br />per every 2.89 acres of land area with approximately 15.3 acres of dedicated Primary and Secondary <br />open space. <br /> <br />Proposed lots range in size from 1.24 acres (54,151 sq. ft.) to 1.87 acres (81,661 sq. ft.). <br /> <br />The following modification(s) have been made to the Preliminary Plat application in an effort to <br />address staff, Planning Board, and adjacent property owner comments associated with the approved <br />Concept Plan: <br />1. A proposed stormwater management area, originally shown behind Lot(s) 7 and 8 as <br />depicted on the Concept Plan, has been formally defined as required by Orange County <br />Erosion Control. <br />The basin is now 18,131 sq. ft. in area within a defined stormwater ‘lot’ that is 36,769 sq. ft. in <br />area. <br />2. The lot lines along Laurel Oak Lane have been revised to clearly delineate the edge of the <br />right-of-way as well as to account for proper roadway alignments in accordance with NC <br />Department of Transportation (NC DOT) guidelines. <br />This move was also necessitated to ensure adequate soils were present on each lot is <br />support active and repair areas for septic systems as required by the Health Department. <br />13