Orange County NC Website
1—11 <br />Orange County Comprehensive Parks and Recreation Master Plan <br />CHAPTER 1 - Summary of the Plan 1 <br />Recommendation 6 – Build More Trails and <br />Connect Open Spaces: <br />One of the clear messages of the Community Needs <br />Assessment surveys is that county residents want to <br />get out into nature and walk, hike and bike more. <br />There are several mechanisms in place that will help <br />with this, buy virtue of building the planned future <br />parks (see Recommendatfon 2). Determining a <br />solutfon to the MST segment in Orange County, and <br />providing trails at nature preserves are additfonal <br />measures that are planned/proposed. Additfonally, <br />there may be ways to connect trail systems that <br />exist in Duke Forest and Eno River State Park to <br />town and county parks and trails. The local <br />governments that would mutually benefit from a <br />connected trail system should look at joint funding <br />mechanisms. <br />Recommendation 7: Improve Access to Parks and <br />Trails, and incorporate Healthy Lifestyles Design: <br />Over the last 15 years, most parks have been <br />constructed with an eye to providing access to the <br />public, and actfvitfes for individuals to develop and <br />maintain healthy lifestyles. However, an emerging <br />issue in the fields of public health and parks <br />planning is the integratfon of these concepts at the <br />design level – parks designed with an eye to <br />maximize opportunitfes for enhancing public health. <br />Likewise, the potentfal for public transportatfon <br />access to County parks is a consideratfon, but in a <br />rural county with a need to provide service to <br />different portfons of the county, this type of access <br />is problematfc. Working park-and-ride lots into <br />future parks, and looking at parks as possible transit <br />stops are two mechanisms that warrant closer <br />examinatfon and should be part of future planning <br />for new parks. <br /> <br />Recommendation 8 – Look to Add Programs in <br />Areas Where Residents Have Identified needs, <br />Consider Partnerships: <br />Flexibility and responsiveness is critfcal to providing <br />public recreatfon programs. Needs and interests <br />change over tfme, and systems must be prepared to <br />change with the tfmes. While it is not practfcal to <br />provide every program that is desired by members <br />of the community, the Community Needs Assess- <br />ments provide a look at current needs and desires. <br />Follow-up surveys should be conducted to deter- <br />mine the depth of interest in new program areas, <br />and at the same tfme, existfng programs should be <br />evaluated to see if resource allocatfon should be <br />altered. The County has partnered in recent years <br />with private non-profit recreatfon providers for <br />certain programs. A “partnership template” being <br />developed will help determine whether a partner- <br />ship is desirable or warranted, and opportunitfes <br />with the school systems in this area may be fruitiul. <br /> <br />Financing and Capital Investments <br />As shown in Table 10-1, Orange County has <br />positfoned itself through careful and proactfve <br />planning to know what park and recreatfon facilitfes <br />are needed, and through its Capital Investment Plan <br />(CIP), a possible sequence of constructfon to fulfill <br />the master plan outlined within these pages may be <br />glimpsed. The funding needed for parks and <br />recreatfon opportunitfes includes: new constructfon <br />of planned parks, future phases of existfng parks, <br />replacement and repair of aging facilitfes, and <br />operatfng and maintenance funding. Approximately <br />$10 million in park and public open space funding is <br />identffied in the current CIP through 2018, and an <br />additfonal $36 million is expected to be needed <br />beyond 2018 to complete the vision of the park <br />system outlined in this plan. An additfonal $467,000 <br />within two years, and $923,000 in two to five years, <br />is projected to be needed for renovatfons and <br />improvements or repairs. As future financial <br />planning is undertaken, the manner in which these <br />needs may be funded will become more clear, as <br />will the potentfal sources (including several potentfal <br />grant projects). <br />25