Orange County NC Website
1 <br />Michael Harvey <br />From:Janine Schreyack <janine@manaengineers.com> <br />Sent:Monday, April 28, 2014 10:38 AM <br />To:Patrick R. Mallett <br />Cc:Michael A Neal; Michael Harvey <br />Subject:RE: Triple Crown Comments <br />Mr. Mallett:  <br />  <br />For the stormwater management plan stabilization under NCG01, there is a 7/14 day stabilization required per NCDENR  <br />depending upon the site area description.  We have revised Note 2 under the Grading Notes on Sheet 1:  Title Sheet to  <br />reflect this. Under the Grading comments on the Title Sheet of the plans we mention a pre‐construction meeting.    <br />  <br />We acknowledge that a stormwater management plan and sediment and erosion control plan will need to be included  <br />as well as 401/404 Permits obtained if the threshold is met during the construction design phase.  <br />  <br />Thanks.  <br />  <br />Janine Schreyack, PE  <br />Michael A. Neal & Associates, PLLC  <br />105 W. Corbin Street, Suite 201  <br />Hillsborough, NC 27278  <br />919‐644‐1277  <br />  <br />  <br />  <br />  <br />  <br />From: Michael A Neal [mailto:mneal@manaengineers.com] <br />Sent: Monday, April 28, 2014 9:46 AM <br />To: Janine Schreyack <br />Subject: FW: Triple Crown Comments <br />  <br /> <br />-----Original Message----- <br />From: Patrick R. Mallett [mailto:pmallett@orangecountync.gov] <br />Sent: Monday, April 28, 2014 9:36 AM <br />To: Michael A Neal <br />Cc: Michael Harvey; Steve J Kaltenbach; Wesley Poole <br />Subject: FW: Triple Crown Comments <br />Michael,  <br />See the comments below from Erosion Control.  Please feel free to coordinate with Wes and Steve as needed desired.    <br />  <br />  <br />Very Respectfully,  <br />  <br />Patrick R. Mallett, Planner II  <br />Orange County Planning & Inspections Department  <br />99