Browse
Search
OCPB agenda 050714
OrangeCountyNC
>
Advisory Boards and Commissions - Active
>
Orange County Planning Board
>
Agendas
>
2014
>
OCPB agenda 050714
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/7/2018 3:09:57 PM
Creation date
3/7/2018 2:59:05 PM
Metadata
Fields
Template:
BOCC
Date
5/7/2014
Meeting Type
Regular Meeting
Document Type
Agenda
Document Relationships
OCPB minutes 050714
(Message)
Path:
\Advisory Boards and Commissions - Active\Orange County Planning Board\Minutes\2014
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
257
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1 <br />Michael Harvey <br />From:Janine Schreyack <janine@manaengineers.com> <br />Sent:Monday, April 28, 2014 10:38 AM <br />To:Patrick R. Mallett <br />Cc:Michael A Neal; Michael Harvey <br />Subject:RE: Triple Crown Comments <br />Mr. Mallett: <br /> <br />For the stormwater management plan stabilization under NCG01, there is a 7/14 day stabilization required per NCDENR <br />depending upon the site area description. We have revised Note 2 under the Grading Notes on Sheet 1: Title Sheet to <br />reflect this. Under the Grading comments on the Title Sheet of the plans we mention a pre‐construction meeting. <br /> <br />We acknowledge that a stormwater management plan and sediment and erosion control plan will need to be included <br />as well as 401/404 Permits obtained if the threshold is met during the construction design phase. <br /> <br />Thanks. <br /> <br />Janine Schreyack, PE <br />Michael A. Neal & Associates, PLLC <br />105 W. Corbin Street, Suite 201 <br />Hillsborough, NC 27278 <br />919‐644‐1277 <br /> <br /> <br /> <br /> <br /> <br />From: Michael A Neal [mailto:mneal@manaengineers.com] <br />Sent: Monday, April 28, 2014 9:46 AM <br />To: Janine Schreyack <br />Subject: FW: Triple Crown Comments <br /> <br /> <br />-----Original Message----- <br />From: Patrick R. Mallett [mailto:pmallett@orangecountync.gov] <br />Sent: Monday, April 28, 2014 9:36 AM <br />To: Michael A Neal <br />Cc: Michael Harvey; Steve J Kaltenbach; Wesley Poole <br />Subject: FW: Triple Crown Comments <br />Michael, <br />See the comments below from Erosion Control. Please feel free to coordinate with Wes and Steve as needed desired. <br /> <br /> <br />Very Respectfully, <br /> <br />Patrick R. Mallett, Planner II <br />Orange County Planning & Inspections Department <br />99
The URL can be used to link to this page
Your browser does not support the video tag.