Orange County NC Website
Article 5: Uses <br /> Section 5.6: Standards for Commercial Uses <br /> <br /> <br />(d) If the Board of County Commissioners does not renew the permit, the <br />permit shall become null and void upon the expiration of the time limit. <br />(e) If the Special Use Permit is not renewed or re-approved, then the <br />applicant may submit a new application as if it were a new use. <br />5.6.10 Microbrewery with Minor Events <br />(A) Standards for Class B Special Use Permit or ASE-CZ or MPD-CZ Zoning Districts <br />(1) In addition to the requirements in Section 2.7 or 2.9, as applicable, the following <br />information shall be submitted with the application materials: <br />(a) Description of special events to be held on-site, including frequency of <br />events, hours of operation, anticipated attendance, and any other <br />pertinent details. <br />(b) Location of overflow parking area(s) if required parking is not anticipated <br />to accommodate all special events. <br />(c) A map depicting surrounding uses and the distance to residential <br />structures. <br />(d) A description of retail sales and facility tours, if proposed. <br />(e) A comprehensive groundwater study, for facilities expected to use more <br />than 240 gallons of groundwater per day per acre of lot area on an <br />annual basis than an average single family residence (which uses 240 <br />gallons of water per day) built at the highest density the existing zoning <br />district would allow. For example, if the existing zoning district allows a <br />residential density of 1 unit for 2 acres and the proposed use is on a six <br />acre parcel (which could yield 3 residences), the proposed use(s) may <br />use three times the water used by an average single family residence (or <br />720 gallons per day, on an annualized basis) before a comprehensive <br />groundwater study is required. The water usage rates of any existing <br />use subject to zoning regulations located on the same lot shall be taken <br />into account when determining if a comprehensive groundwater study is <br />required. Said study shall detail:25 <br />(i) The amount of water anticipated to be used on a daily, weekly, <br />monthly, and annual basis by regulated uses located on the <br />parcel (e.g., water usage by bona fide farm uses is not required <br />to be included); <br />(ii) An analysis of the amount of groundwater withdrawal considered <br />to be safe and sustainable in the immediate vicinity; and <br />(iii) An analysis of whether other wells in the vicinity of the proposed <br />use will are expected to be affected by withdrawals made by the <br />proposed use. <br />(2) Site shall have direct access to a major road, as classified in the Orange County <br />Comprehensive Plan, and shall use said road as the primary access, unless <br />approved otherwise in the permit. <br />25 This standard and requirement is consistent with a similar requirement for uses in the REDA-CZ zoning district. <br />240 gallons per day was used as the “cut off” because it is the average amount used by a single family residence. <br />The amount of water used by an average single family residence, constructed at the density the existing zoning <br />district allows, is used as the baseline standard because residences are the predominant land uses in the county <br />and the most likely “by right” uses to be constructed. Text shown in blue was presented as a change to the <br />proposed text at the February 24, 2014 quarterly public hearing. Text shown in green is clarifying text added after <br />the quarterly public hearing in response to questions at the public hearing. PLEASE NOTE THAT THIS FOOTNOTE <br />PERTAINS TO ALL PROPOSED USES THAT INCLUDE THIS PROPOSED REQUIREMENT. <br /> <br />Orange County, North Carolina – Unified Development Ordinance Page 5-57 <br /> <br /> <br />82