Browse
Search
OCPB agenda 040214
OrangeCountyNC
>
Advisory Boards and Commissions - Active
>
Orange County Planning Board
>
Agendas
>
2014
>
OCPB agenda 040214
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/7/2018 2:58:48 PM
Creation date
3/7/2018 2:47:53 PM
Metadata
Fields
Template:
BOCC
Date
4/2/2014
Meeting Type
Regular Meeting
Document Type
Agenda
Document Relationships
OCPB minutes 040214
(Message)
Path:
\Advisory Boards and Commissions - Active\Orange County Planning Board\Minutes\2014
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
216
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />RECOMMENDATION: <br /> <br /> <br />Staff has not received any information that would establish grounds for making a negative finding on the general <br />standards. These standards include maintaining or promoting the public health, safety, and general welfare, <br />maintaining or enhancing the value of contiguous property, and the use being in compliance with the general plan <br />for the physical development of the County. <br /> <br />Staff has reviewed the application, the site plan, and all supporting documentation and has found that the <br />applicant complies with the specific standards and required regulations as outlined within the UDO. <br /> <br />Provided the Planning Board and the Board of County Commissioners finds in the affirmative on the specific and <br />general standards, the Board could make a positive finding on this application. In the event that the Planning <br />Board makes the determination that the permit can be issued, Planning Staff recommends the attachment of the <br />following conditions to the Special Use Permit: <br />(1) The applicant shall cause a formal and detailed landscape and tree preservation plan shall be submitted <br />and approved by the Orange County Planning Department within 180 days from the approval of the <br />Special Use Permit. <br />(2) A revised site plan shall be submitted denoting the required Pedestrian/Landscape Ratio for the project <br />as required under Section 3.3 of the UDO. This revised sheet shall be submitted within 180 days from <br />the approval of the Special Use Permit. <br />(3) That the applicant complete and submit a formal application to the Orange County Inspections <br />Department requesting authorization to commence construction of the proposed solar array. The <br />application, including all applicable fees, shall be submitted within 180 days from the approval of the <br />Special Use Permit. <br />(4) That the Orange County Fire Marshal’s office shall review and approve the final site plan, as part of the <br />normal building permit review process, and that any and all modifications be made to address fire code <br />issues and access prior to the issuance of the permit authorizing the commencement of land disturbing <br />activities. <br />(5) The applicant shall provide a detailed, scaled, map to the Orange County Fire Marshal’s office and the <br />Efland Volunteer Fire Department denoting the location of all storage areas for batteries, master cut-off <br />switches, and other similar devices to ensure the protection of emergency responders in the event of a <br />catastrophic incident on the property. This map shall be submitted prior to the issuance of a Certificate of <br />Occupancy by the County allowing for operation of the facility to commence. <br />(6) That prior to the commencement of land disturbing activity the applicant shall submit all necessary <br />stormwater, grading plans, and erosion control applications to the Orange County Erosion Control <br />Department for review and processing. These applications shall be submitted within 180 days from the <br />issuance of the SUP. <br />(7) That the applicant shall submit the approved site plan to NC DOT for review and comment. In the event it <br />is determined that the applicant is required to apply for, and receive a, driveway permit from NC DOT to <br />allow for the project to be developed, the applicant shall submit all necessary applications as required by <br />NC DOT within 180 days from the issuance of the SUP and provide planning staff with a copy of the <br />issued permit. <br />38
The URL can be used to link to this page
Your browser does not support the video tag.