Orange County NC Website
<br /> <br /> <br /> <br />SECTION 5.9.6 (C) SOLAR ARRAY – PUBLIC UTILITY ("Yes" indicates compliance; "No" <br />indicates non-compliance) <br />Ordinance <br />Requirements <br /> PLANNING <br />STAFF <br />RECOMMENDED <br />FINDINGS <br />EVIDENCE SUBMITTED <br />TO SUPPORT <br />FINDINGS <br />PLANNING <br />BOARD <br />FINDINGS <br />Section 5.9.6 (C) of the <br />UDO establishes <br />additional submittal <br />requirements and <br />standards of evaluation <br />for a solar array public <br />utility <br /> <br /> <br />5.9.6 (C) (1) <br /> <br />In addition to the <br />information required by <br />Section 2.7, the following <br />shall be submitted as part <br />of the application: <br /> <br /> <br />5.9.6 (C) (1) (a) <br /> <br />A site plan showing all <br />existing structures on the <br />property, any proposed <br />buildings or structures <br />that are necessary to <br />support the proposed <br />array, existing and <br />proposed storage areas, <br />parking and access areas, <br />topography at a contour <br />interval of five feet, any <br />officially designated <br />floodplains or alluvial <br />soils. <br /> <br /> X__Yes ____No Attachment 1 of the <br />February 24, 2014 <br />Quarterly Public Hearing <br />packet contained a site <br />plan denoting required <br />information. <br /> <br /> ___Yes ____No <br />5.9.6 (C) (1) (b) <br /> <br />Plans and elevations for <br />all proposed structures <br />and arrays as well as <br />descriptions of the color <br />and nature of all exterior <br />materials <br /> X__Yes ____No Attachment 1 of the <br />February 24, 2014 <br />Quarterly Public Hearing <br />packet contained a site <br />plan denoting required <br />information. <br /> <br />The site plan indicates <br />no buildings are <br />proposed for the site. <br /> <br /> ___Yes ____No <br />29