Browse
Search
OCPB agenda 020514
OrangeCountyNC
>
Advisory Boards and Commissions - Active
>
Orange County Planning Board
>
Agendas
>
2014
>
OCPB agenda 020514
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/7/2018 2:42:48 PM
Creation date
3/7/2018 2:40:48 PM
Metadata
Fields
Template:
BOCC
Date
2/5/2014
Meeting Type
Regular Meeting
Document Type
Agenda
Document Relationships
OCPB minutes 020514
(Message)
Path:
\Advisory Boards and Commissions - Active\Orange County Planning Board\Minutes\2014
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
45
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1 <br />Michael Kelly <br />From:Wesley Poole <br />Sent:Friday, January 10, 2014 5:58 PM <br />To:Michael Kelly; Steve J Kaltenbach <br />Cc:Michael Harvey <br />Subject:RE: Pleasant Green Woods, Phase IV Major Subdivision <br />Sorry for the delay in comments, but below are my 2 cents: <br /> <br />The concept plan for Pleasant Green Woods, Phase IV appears feasible in regards to erosion control / stormwater design <br />potential, but please note that this portion of the development will be subject to the new stormwater regulations unlike <br />previous phases that only had peak flow requirements. We prefer to avoid individual lot stormwater controls and <br />instead account for a full build-out scenario and design a master stormwater structure/s with loading rate restrictions of <br />2.2 lbs/ac/yr for nitrogen and 0.33 lbs/ac/yr for phosphorus in the Lower Eno Protected Watershed. <br /> <br />Thanks, <br />Wesley Poole <br />Orange County Planning & Inspections Dept. <br />Erosion Control Division <br />(919) 245-2587 <br /> <br /> <br /> <br />From: Michael Kelly <br />Sent: Thursday, January 02, 2014 2:45 PM <br />To: Wesley Poole; Steve J Kaltenbach <br />Subject: Pleasant Green Woods, Phase IV Major Subdivision <br />Importance: High <br /> <br />Dear Wes and Steve: <br /> <br />Current Planning received an application for a major subdivision in the County, Pleasant Green Woods, Phase IV. We <br />would like very much for Erosion Control to review both the Flexible Development and Site Analysis Plans attached. <br /> <br />Thank you, <br />Michael Kelly, Planning Technician <br />Orange County Planning & Inspections Department <br />131 W. Margaret Ln., Ste. 201 (Physical Location) <br />P.O. Box 8181 (Mail) <br />Hillsborough, NC 27278 <br />(919) 245-2598 - phone <br />(919) 644-3022 – fax <br /> <br />Pursuant to North Carolina General Statute 132, correspondence sent and received from this account is a <br />public record and may be disclosed to third parties. <br /> <br />39
The URL can be used to link to this page
Your browser does not support the video tag.