Orange County NC Website
Implementation Bridge - Future Phase Suggestions Planning Staff Comment <br />69.Section 2.2.8 (A), Shouldn't have to wait a year if withdrawn. 6- <br />months for withdrawal and 1-year for denial? <br />70.Section 2.15.3 (C) (4).- There is no deadline for agencies to <br />respond. <br />71.Section 2.15.2 (C) (5) - Not applicable if flexible development <br />option used. <br />72.Section 2.17, Need a process other than that of a major <br />subdivision for recombining existing lots. <br />73.Need language that will differentiate between the different types <br />of residential zoning districts. <br />This is the purpose of the "Purpose", "Applicability" and "Dimensional <br />and Ratio Standards" sections of each of the zoning charts contained in <br />Article 3. <br />74. <br />Regarding Impervious Surface Ratios and Sliding Scales, the two <br />tables should be combined into one. Need to understand <br />ramifications of any proposed changes --Section 4.2.5. <br />COMPLETED as part of UDO adoption process. <br />75.Some home occupations are permitted but not associated <br />storage? This needs clarification. <br />Changes to Home Occupation standards will be heard at the November <br />2013 QPH. <br />76.Kennels and Riding Stables should be addressed separately. Should <br />they require a Class A or Class B Special Use Permit? <br />These two uses were uncoupled as a use category with an amendment <br />adopted on October 18, 2011. The question regarding which approval <br />process to use has not been resolved. <br />77.Clarify how open space areas of golf courses are counted towards <br />meeting ordinance requirements. <br />90