Browse
Search
OCPB agenda 110613
OrangeCountyNC
>
Advisory Boards and Commissions - Active
>
Orange County Planning Board
>
Agendas
>
2013
>
OCPB agenda 110613
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/7/2018 2:28:27 PM
Creation date
3/7/2018 2:21:08 PM
Metadata
Fields
Template:
BOCC
Date
11/6/2013
Meeting Type
Regular Meeting
Document Type
Advisory Bd. Minutes
Document Relationships
OCPB minutes 110613
(Message)
Path:
\Advisory Boards and Commissions - Active\Orange County Planning Board\Minutes\2013
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
156
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Efland-Mebane*Eno EDD NC 57 Speedway <br />Small Area Plan Reccommendations <br />Develop design standards for <br />Efland Core Mixed Use area - <br />HIGH priority - work has been <br />done but denied by the BOCC in <br />Feb. 2013; to be reconsidered at <br />the Fe. 2014 QPH <br />Require new development or <br />rezoning approvals to limit <br />groundwater withdrawls to that of a <br />single-family dwelling (480 gpd) - <br />COMPLETE (included in REDA <br />conditional zoning district) <br />Reevaluate Watershed Critical <br />Area (Seven Mile Creek) and <br />amend if required - HIGH priority - <br />COMPLETE <br />Review the need to develop <br />regulations governing air quality <br />and requiring local air quality <br />permits <br />Ordinance amendments to <br />address parking lot design, <br />circulation, and access. - These <br />concerns in relation to <br />speedways/go cart tracks were <br />included in the amendments made <br />to Section 5.7.5 as part of the <br />REDA conditional zoning district <br />amendments. <br />Transportation Study road volumes and capacities <br />- County to communicate to DOT <br />Limit access near I-85/US70 <br />interchange <br />Complete an entry corridor design <br />manual <br />NOTE: <br />Comprehensive <br />Transportation Plan <br />currently being <br />prepared for OC, <br />which may provide <br />initial steps towards <br />implementing some <br />of these items. <br />Realign Efland-Cedar <br />Grove/Forrest Ave./Mt. Willing <br />road corridor - County to <br />communicate to DOT - the <br />proposed zoning overlay district in <br />this area (to be reconsidered at the <br />Feb 2014 QPH) takes this into <br />account <br />Acquire property and develop a <br />welcome sign with landscaping <br />Connection from Hwy 70E to <br />Interstate connector identified and <br />constructed - County to <br />communicate to DOT - the <br />proposed zoning overlay district in <br />this area (to be reconsidered at the <br />Feb 2014 QPH) takes this into <br />account <br />Add park-n-ride lot - MEDIUM <br />HIGH priority - project has been <br />added to the MPO transportation <br />planning process project list <br />70
The URL can be used to link to this page
Your browser does not support the video tag.