Browse
Search
OCPB agenda 110613
OrangeCountyNC
>
Advisory Boards and Commissions - Active
>
Orange County Planning Board
>
Agendas
>
2013
>
OCPB agenda 110613
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/7/2018 2:28:27 PM
Creation date
3/7/2018 2:21:08 PM
Metadata
Fields
Template:
BOCC
Date
11/6/2013
Meeting Type
Regular Meeting
Document Type
Advisory Bd. Minutes
Document Relationships
OCPB minutes 110613
(Message)
Path:
\Advisory Boards and Commissions - Active\Orange County Planning Board\Minutes\2013
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
156
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
e. School District: The project is split between the Chapel <br />Hill/Carrboro County Schools and Orange County Schools. <br />Please refer to Attachment 2 for additional information. <br />f. Future Land Use Map Designation: Rural Buffer <br />g. Growth Management System Designation: Rural <br />h. Joint Land Use Plan Designation: Rural Buffer – University <br />Lake category <br />i. Existing Conditions/Physical Features: Varying topography <br />with heavy vegetation, primarily mixed hardwoods, throughout. <br />There are streams running through the property with varying <br />slopes. Stream corridor width varies from 120 feet to 250 feet. <br />The property is encumbered by floodplain. <br />j. Roads: Vehicular access to the parcel is through Dairyland <br />Road, a state-maintained road and Triple Crown Drive, a private <br />road that is in the process of being accepted by NCDOT for <br />addition to the State maintained system. <br />k. Water and Sewer Service: The property is not located within a <br />primary public utility service area according to the Water and <br />Sewer Management Planning Boundary Agreement <br />(WASMPBA). <br />Proposed lots are to be served by individual well and septic <br />systems. <br /> <br />Surrounding Land Uses: a. NORTH: Single family residences Zoned RB <br />b. SOUTH: Single-family residences zoned RB <br />c. EAST : Single-family residences zoned RB <br />d. WEST: Single-family residence zoned RB <br /> <br />Development Process, Schedule, and Action: The typical cadence for the review of a major <br />subdivision is as follows: <br />• First Action – Planning staff schedules a Neighborhood Information Meeting (NIM). <br />Staff Comment – DONE. This meeting was held on October 3, 2013. Please refer <br />to Attachment 5 for a synopsis of meeting comments. <br />• Second Action – The Planning Board reviews and takes action on the Concept <br />Plan application approving either the ‘conventional’ or ‘flexible development’ layout. <br />The Planning Board review begins on November 6, 2013. As a reminder the <br />Concept Plan review is intended to allow Board members and the applicant to <br />discuss the nature of the project and identify possible solutions to concerns <br />identified by staff or surrounding property owners. <br />If approved the Concept Plan serves as a ‘roadmap’ for the developer with respect <br />to the acceptable lot and road layout as well as location of proposed/required open <br />space and recreation areas. <br />22
The URL can be used to link to this page
Your browser does not support the video tag.