Browse
Search
OCPB agenda 040313
OrangeCountyNC
>
Advisory Boards and Commissions - Active
>
Orange County Planning Board
>
Agendas
>
2013
>
OCPB agenda 040313
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/7/2018 2:08:28 PM
Creation date
3/7/2018 2:06:58 PM
Metadata
Fields
Template:
BOCC
Date
4/3/2013
Meeting Type
Regular Meeting
Document Type
Advisory Bd. Minutes
Document Relationships
OCPB minutes 040313
(Message)
Path:
\Advisory Boards and Commissions - Active\Orange County Planning Board\Minutes\2013
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
36
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Article 2: Procedures <br /> Section 2.4: Zoning Compliance Permits <br /> <br /> <br />Orange County, North Carolina – Unified Development Ordinance Page 2-8 <br /> <br />(2) Interior renovation or repair of an existing structure, provided the use of the lot <br />and/or structure has not changed. <br />(C) Issuance of a Zoning Compliance Permit is required prior to beginning the excavation for <br />the construction, moving, alteration, or repair, except ordinary repairs, of any building or <br />other structure, including an accessory structure. The Zoning Compliance Permit shall <br />include a determination that plans, specifications and the intended use of the structure <br />conforms to the provisions of this Ordinance. <br />(D) Issuance of a Zoning Compliance Permit is required to change the type of use or type of <br />occupancy of any building, or to expand any use on any lot on which there is a non- <br />conforming use. The Zoning Compliance Permit shall include a determination that the <br />proposed use conforms to the provisions of this Ordinance. <br />2.4.2 Requirements and Conditions <br />(A) In cases where the development and/or commencement of a land use requires the <br />issuance of a Special Use or a Conditional Use Permit, a Zoning Compliance Permit shall <br />not be issued until the aforementioned permit has been issued by the responsible board <br />in accordance with the review and approval procedures detailed herein. <br />(B) Issuance of a Special Use or Conditional Use Permit does not negate the requirement for <br />a Zoning Compliance Permit. <br />(C) Issuance of a Zoning Compliance Permit does not establish a vested right to begin and <br />complete construction or change the use/occupancy of a lot or building should <br />regulations change subsequent to issuance of said permit. <br />(D) Application for Zoning Compliance Permit shall specify the method of disposal of trees, <br />limbs, stumps and construction debris associated with the permitted activity. Open <br />burning of trees, limbs, stumps, and/or construction debris associated with the permitted <br />activity is expressly prohibited. <br />(E) No building, structure, or zoning lot for which a Zoning Compliance Permit has been <br />issued shall be used or occupied until the Building Inspector has, after final inspection, <br />issued a Certificate of Occupancy indicating compliance with all the provisions of this <br />Ordinance. <br />(F) No building, structure, or zoning lot for which a Zoning Compliance Permit has been <br />issued shall be used or occupied until the Orange County Health Department has <br />approved the water supply and sewage disposal systems serving that use. <br />(G) Issuance of a Certificate of Occupancy by the Building Official or the approval of a water <br />supply and sewage disposal system by the Health Department shall in no case be <br />construed as waiving any provision of this Ordinance. <br />(H) Zoning Compliance Permits shall become null and void after 18 months from the date of <br />issuance if a building permit is not applied for or land disturbing activities are not <br />commenced in accordance with the provisions of this Ordinance. <br />2.4.3 Plot Plan Specifications <br />(A) For development types requiring a plot plan rather than a site plan, the plot plan shall <br />contain the following: <br />(1) A scaled drawing denoting the length of all property lines, <br />(2) A north arrow denoting the orientation of the lot and all proposed structures, <br />(3) The location of the proposed structure(s) and distances from all property lines, <br />(4) The location of the proposed driveway, <br />(5) The location of the proposed septic system and proposed drain lines on the <br />property, <br />26
The URL can be used to link to this page
Your browser does not support the video tag.