Browse
Search
OCPB agenda 040313
OrangeCountyNC
>
Advisory Boards and Commissions - Active
>
Orange County Planning Board
>
Agendas
>
2013
>
OCPB agenda 040313
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/7/2018 2:08:28 PM
Creation date
3/7/2018 2:06:58 PM
Metadata
Fields
Template:
BOCC
Date
4/3/2013
Meeting Type
Regular Meeting
Document Type
Advisory Bd. Minutes
Document Relationships
OCPB minutes 040313
(Message)
Path:
\Advisory Boards and Commissions - Active\Orange County Planning Board\Minutes\2013
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
36
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
3 <br /> <br />This proposed amendment is designed to: <br />1. Require formally prepared site plans for those projects exceeding established <br />stormwater disturbance thresholds for residential projects. <br />Submittal of formal site plans is already required for all non-residential projects <br />regardless of the proposed land disturbance activity. <br />2. Incorporate references within various locations of the UDO identifying which <br />land development projects need to comply with these standards in an effort to <br />eliminate confusion and provide definitive application submittal standards. <br />3. Add language requiring stormwater management plans for minor and major <br />subdivisions where anticipated land disturbance activities would exceed <br />established thresholds. <br />Both Planning and Erosion Control staff agree potential problems can be <br />eliminated if there is a formal stormwater management plan approved during <br />the subdivision review and approval process. <br />There are also 3 options with respect to addressing existing language in Section 2.4.1 <br />requiring a professionally prepared site plan for any project within the University Lake <br />Watershed Protection Overlay District: <br />– Option A: Leave as is – no change. (i.e. only properties in the University <br />Lake Watershed impacted). <br />– Option B: Amend section requiring all watershed overlay districts with a <br />6% impervious surface limit be treated the same (i.e. professional site <br />plan). <br />– Option C: Eliminate requirement all together and require professionally <br />prepared site plans only when stormwater thresholds are exceeded. <br />Staff supports either Option B or C as detailed above. <br /> <br />2. Analysis <br />As required under Section 2.8.5 of the Orange County Unified Development <br />Ordinance, the Planning Director is required to: ‘cause an analysis to be made of <br />the application and, based upon that analysis, prepare a recommendation for <br />consideration by the Planning Board and the Board of County Commissioners’. <br />The proposed amendment is designed to incorporate established stormwater <br />management land disturbance thresholds into existing language within the UDO <br />requiring formal site plan preparation and submittal by an applicant when said <br />thresholds are exceeded. <br />By modifying existing language we hope to eliminate unnecessary cost for the <br />applicant, with respect to the completion of multiple site plans, and provide sufficient <br />detail to residents, property owners, and developers on when formal site plan <br />preparation is necessary. <br />The amendment is also designed to provide a ‘central site plan’ for review to ensure <br />staff is reviewing and taking action on the same document to avoid confusion and <br />unnecessary duplication of effort. <br /> <br />3. Comprehensive Plan Linkage (i.e. Principles, Goals and Objectives) <br />This amendment is designed to provide additional references to existing <br />development standards already contained within the UDO. <br />19
The URL can be used to link to this page
Your browser does not support the video tag.