Browse
Search
BOA minutes 031411
OrangeCountyNC
>
Advisory Boards and Commissions - Active
>
Orange County Board of Adjustment
>
Minutes
>
2011
>
BOA minutes 031411
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/26/2018 9:19:14 AM
Creation date
3/7/2018 11:07:39 AM
Metadata
Fields
Template:
BOCC
Date
3/14/2011
Meeting Type
Regular Meeting
Document Type
Advisory Bd. Minutes
Document Relationships
BOA agenda 031411
(Attachment)
Path:
\Advisory Boards and Commissions - Active\Orange County Board of Adjustment\Agendas\2011
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
59
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Approved 6/13/2011 <br />OC Board of Adjustment – 3/14/11 Page 50 of 59 <br />1 <br />b) Method and adequacy of <br />police, fire and rescue squad <br />protection. <br /> <br /> X Yes _____No The White Cross Rural Fire <br />Department will provide fire <br />protection. <br /> <br />Rescue services will be <br />provided by Orange County <br />EMS. <br /> <br />The Orange County Sheriff’s <br />Department shall provide <br />police protection. <br /> <br />The Fire Marshal has indicated <br />is a new e-mail, dated March <br />4, 2011, that recent site plan <br />modifications have addressed <br />his concerns and that he can <br />serve the project as now <br />proposed. <br /> <br /> Yes _____No <br />c) Method and adequacy of <br />vehicle access to the site and <br />traffic conditions around the site. <br /> <br /> x Yes _____No The site plan indicates the lot <br />is accessed through a <br />driveway onto Old <br />Greensboro Highway. <br /> <br />NC DOT will need to review in <br />order to determine if a <br />driveway permit can be issued <br />allowing for the existing <br />driveway to be used to support <br />the hoarse boarding and <br />training facility. <br />They cannot issue final <br />approval until there is an <br />approved site plan. This <br />should be a condition of <br />approval. <br /> <br /> Yes _____No <br /> 2 <br />3 <br />4 <br />5 <br />Motion made by Dawn Brezina to proceed with the recommendations as outlined by staff for Articles 8.2.4b and c <br />to be found in the affirmative. Seconded James Carter. <br />Vote: Unanimous
The URL can be used to link to this page
Your browser does not support the video tag.