Orange County NC Website
Approved 3/14/2011 <br /> <br />OC Board of Adjustment – 11/8/2010 Page 42 of 43 <br />1 <br />Article 8.2.1 <br />3. The location and character of <br />the use, if developed according <br />to the plan submitted, will be in <br />harmony with the area in which <br />it is to be located and the use is <br />in compliance with the general <br />plan for the physical <br />development of the County as <br />embodied in these regulations <br />or in the Comprehensive Plan, <br />or portion thereof, adopted by <br />the Board of County <br />Commissioners. <br /> <br /> To be determined by Board <br />after receiving evidence to be <br />submitted or heard at public <br />hearing. <br /> <br /> Is <br /> <br />___ Is Not <br /> 2 <br />3 <br />4 <br />5 <br />6 <br />7 <br />8 <br />9 <br />MOTION made by Larry Wright to find in the affirmative for Article 8.2.1, subsection 3 based on the testimony of Mr. <br />Harvey that the stream buffers have been adhered to and it has been determined on pages 127 and 128 in our packet <br />and the abstracts how this does conform to the Comprehensive Plan. Mr. Sykes testified that there are no fire or <br />safety code conditions and it is consistent with the agricultural land use category. Seconded by Mark Micol. <br />VOTE: Unanimous <br /> <br /> <br />RECOMMENDATION 10 <br />11 <br />12 <br />13 <br />14 <br />15 <br />16 <br />17 <br />18 <br />19 <br />20 <br />21 <br />22 <br />23 <br />24 <br />25 <br />26 <br />27 <br />28 <br />29 <br />30 <br />31 <br />32 <br />The Planning Staff has not received any information that would establish grounds for making a negative finding on the <br />general standards. These standards include maintaining or promoting the public health, safety, and general welfare, <br />maintaining or enhancing the value of contiguous property, and the use being in compliance with the general plan for <br />the physical development of the County. <br /> <br />The Planning Staff has reviewed the application, the site plan, and all supporting documentation and has found that <br />the applicant does comply with the specific standards and required regulations. <br /> <br />In the event that the Board of Adjustment makes the determination that the permit can be issued, Planning Staff <br />recommends the attachment of the following conditions: <br /> <br />(1) That the applicant complete and submit a formal application to the Orange County Inspections Department <br />requesting authorization to commence construction of the proposed kennel facility. The application, including <br />all applicable fees, shall be submitted within one hundred eighty (180) days from the approval of the Special <br />Use Permit. Further, the building permit application shall be reviewed and approved by the Director of Animal <br />Control for compliance with any and all applicable animal control regulations in accordance with the <br />provisions of Section 8.8.11.3 of the Zoning Ordinance, <br />(2) That the Orange County Fire Marshall’s office shall review and approve the building plans, as part of the <br />normal building permit review process, and that any and all modifications to the structure be made to address <br />fire code issues prior to the issuance of the permit authorizing the commencement of construction activities, <br />(3) That the applicant complete, submit, and receive approval for a Class II Kennel application from the Orange <br />County Animal Control Department within one hundred eighty (180) days from the issuance of the SUP,