Orange County NC Website
Approved 3/14/2011 <br /> <br />OC Board of Adjustment – 11/8/2010 Page 24 of 43 <br />2 <br />4 <br />6 <br />7 <br />8 <br />9 <br />10 <br />11 <br />12 <br />13 <br />14 <br />15 <br />16 <br />17 <br />18 <br />19 <br />20 <br />21 <br />22 <br />23 <br />24 <br />25 <br />26 <br />27 <br />28 <br />29 <br />30 <br />31 <br />32 <br />33 <br />34 <br />35 <br />36 <br />37 <br />38 <br />39 <br />40 <br />41 <br />42 <br />43 <br />44 <br />45 <br />(6) That the applicant obtain a driveway permit for the facility from NC DOT within one hundred eighty (180) days 1 <br />from the issuance of the SUP <br />(7) If any condition of this Special Use Permit shall be held invalid or void, then this Special Use Permit shall be 3 <br />void in its entirety and of no effect, and <br />(8) The Special Use Permit will automatically expire within twelve (12) months from the date of approval if the use 5 <br />has not commenced or construction has not commenced or proceeded unless a timely application for <br />extension of this time limit is approved by the Board of County Commissioners as provided in 8.4.11 of the <br />Orange County Zoning Ordinance. <br />Thomas Brown: Now we come to the recommendations and conditions based on the testimony of staff. They have <br />reviewed the conditions 1-6 and added 7-10 and then renumbering 7 and 8 to numbers 11 and 12. We will be required <br />to have a motion that accepts the conditions for approval for this special use permit for final determination. We need <br />to ensure we have the wording of these additional conditions. We will add wording into condition number 7 that the <br />applicant will ensure that a revised impact study statement by Mr. Vic Knight is submitted within 60 days. Number 8, <br />that the applicant during the permit process submits sufficient detail to verify adherence to Sections 8.8.21.1c and <br />8.8.21.2d. <br /> <br />David Blankfard: The submittal shall show sufficient color and nature of all structures. <br /> <br />Thomas Brown: Condition 9, that in conjunction with the DOT permit, that the applicant submit plans for directional <br />signage. Condition 10 that the applicant adhere to the existing Orange County Noise Ordinance. <br /> <br />David Blankfard: I think in number 8 we were suppose to have a landscaping plan. <br /> <br />Thomas Brown: If we go with 21c and 21d that will be sufficient. If we are all in agreement with the conditions, we <br />would need a final motion to approve the special use permit case A-4-10 with an attachment requiring the adherence <br />to the following conditions, 1-12. <br /> <br />(1) That within one hundred eight (180) days from the approval of the Special Use Permit the applicant develop, <br />in coordination with Planning Staff and representatives of Orange County Cooperative Extension, and obtain <br />approval of a landscape plan that utilizes drought tolerant, indigenous, vegetation that satisfies the required <br />Type A twenty (20) foot landscape buffer mandated by the Orange County Zoning Ordinance, <br />(2) That the applicant complete and submit a formal application to the Orange County Inspections Department <br />requesting authorization to commence construction of the proposed structures. The application, including all <br />applicable fees, shall be submitted within one hundred eighty (180) days from the approval of the Special Use <br />Permit, <br />(3) That the applicant obtain any and all required Erosion Control and Sedimentation permits authorizing land <br />disturbing activities within one hundred eighty (180) days from the approval of the Special Use Permit, <br />(4) That within one hundred eighty (180) days from the approval of the Special Use Permit the applicant submit a <br />detailed plan for the provision of portable toilets and hand washing stations for review and approval by the <br />Orange County Health Department, <br />(5) That the applicant be required to submit a sign rendering for review and approval by the Planning Department <br />within one hundred eighty (180) days from the issuance of the SUP and that the approved sign shall be <br />installed prior to the issuance of a Certificate of Occupancy allowing for the ball field operation to commence, <br />(6) That the applicant obtain a driveway permit for the facility from NC DOT within one hundred eighty (180) days <br />from the issuance of the SUP,