Orange County NC Website
APPROVED 5/10/2010 <br /> <br />OC Board of Adjustment – 3/8/2010 Page 85 of 86 <br />1 2 3 4 <br />5 6 <br />7 8 9 <br />10 11 12 13 <br />14 15 16 <br />17 18 <br />19 20 21 22 <br />23 24 <br />25 <br />26 <br />27 28 <br />29 <br />30 <br />31 32 <br />33 <br />34 <br />35 36 <br />37 <br />38 <br />39 40 <br />41 <br />42 <br />43 44 <br />45 <br />46 <br />47 48 <br />49 <br />50 <br />(2) That the Orange County Fire Marshall’s office shall review and approve the building plans, as <br />part of the normal building permit review process, and that any and all modifications to the <br />structure be made to address fire code issues prior to the issuance of the permit authorizing the <br />commencement of construction activities, <br />(3) That the required buffer, as shown on the submitted site plan, be installed and approved by the <br />County within one hundred eighty (180) days from the approval of the Special Use Permit, <br />(4) That the applicant complete, submit, and receive approval for a Class II Kennel application from <br />the Orange County Animal Control Department within one hundred eighty (180) days from the <br />issuance of the SUP, <br />(5) That the applicant be required to submit a sign rendering for review and approval by the <br />Planning Department within one hundred eighty (180) days from the issuance of the SUP and <br />that the approved sign shall be installed prior to the issuance of a Certificate of Occupancy <br />allowing for kennel operations to commence. <br />(6) That the applicant apply for and receive a driveway permit from NC DOT within one hundred <br />eighty (180) days from the issuance of the SUP and provide planning staff with a copy of the <br />issued permit, <br />(7) If any condition of this Special Use Permit shall be held invalid or void, then this Special Use <br />Permit shall be void in its entirety and of no effect, and <br />(8) The Special Use Permit will automatically expire within twelve (12) months from the date of <br />approval if the use has not commenced or construction has not commenced or proceeded <br />unless a timely application for extension of this time limit is approved by the Board of County <br />Commissioners as provided in 8.4.11 of the Orange County Zoning Ordinance. <br /> <br />Jeffrey Schmitt: added this as number 9. In addition, there are four specific sound engineering requirements that were stated <br />by Mr. Stewart are to be incorporated and explicitly noted in the detailed construction plans when submitted to the Fire <br />Marshall’s office. <br />1. Acoustic windows with the three-inch air gap. <br />2. The solid door construction. <br />3. The acoustic ceiling. <br />4. The acoustic ductwork vent. <br /> <br />Tom Brown: What is a buffer yard? <br /> <br />Jeffrey Schmitt: The hearing is closed so Michael can’t provide anything. <br /> <br />Tom Brown: Just buffer. I haven’t seen anything that says buffer yard. <br /> <br />Jeffrey Schmitt: If we change that to say something about distance and landscaping. <br /> <br />Tom Brown: I am just looking at the definition of buffer. <br /> <br />Jeffrey Schmitt: Does it say that in here? <br /> <br />Tom Brown: It screened by its use to moderate both impacts of one land use and one another. <br /> <br />Jeffrey Schmitt: Would you prefer that to yard? <br /> <br />Tom Brown: Just say required “buffer” on number 3. <br /> <br />Jeffrey Schmitt: Are there any addendums or additions to these?