Orange County NC Website
APPROVED 11/11/2013 <br />OC Board of Adjustment – 9/10/2013 Page 36 of 38 <br />of the project. There is also Berryman Boulevard which has a sidewalk which is counted as a 1 <br />pedestrian bridge and crossing as well. As it has been testified this evening, I will confirm we 2 <br />have a network of trails across including under the bridge affording access around Nancy Hill 3 <br />Creek/Strouds Creek as required by the special use permit. 4 <br /> 5 <br />Geof Gledhill: Do you have illustrations of your testimony? 6 <br /> 7 <br />Michael Harvey: Yes. I am handing out document detailing the location…. 8 <br /> 9 <br />Geof Gledhill: Some of this does duplicate what Mr. Buck has done. 10 <br /> 11 <br />Michael Harvey: On the cover page, Condition 27, this is paraphrased for you referenced the 12 <br />installation of pedestrian access points off Graham Drive, Cameron Circle to allow for access to 13 <br />the walking/hiking paths on the other side of Nancy Hill Creek. One of the concerns that staff had 14 <br />in terms of bringing this appeal forward was for you to understand that Graham Drive and 15 <br />Cameron Circle don’t exist. They were on the approved site plan but those names have changed 16 <br />as allowed so we wanted to provide you with documentation showing you where these stream 17 <br />crossing are and these access points are so you will have a better understanding that the 18 <br />requirements of Condition 27 with respect to this issue have been addressed.. Open space 19 <br />passive area access consistent with the requirements of the condition are now located off 20 <br />Churton Grove Boulevard, West Hatterleigh Avenue and Berryman Avenue. Berryman Avenue is 21 <br />the bridge extended over Nancy Hill/Stroud’s Creek. Page 2 provides you an approximate detail 22 <br />of … 23 <br /> 24 <br />Larry Wright: Berryman Avenue goes over Nancy Hill Creek? 25 <br /> 26 <br />Michael Harvey: Yes. This is Berryman here with the blue drawn roadway. 27 <br /> 28 <br />David Rooks: I don’t know that he understands that this is Scotswood. 29 <br /> 30 <br />Michael Harvey: We wanted to provide you with a copy of the approved site plan showing the 31 <br />current street configuration so you can get an idea of what it looks like currently. Page 3 is a 32 <br />clean copy of Churton Grove the special use permit project and page 4 provides a map showing 33 <br />various trails. I will point out that this street, Churton Grove Boulevard, you will see the green 34 <br />denoted trail system leading from Churton Grove Boulevard and Nancy Hill Creek. There is a 35 <br />sidewalk which we have pointed out with a highlight on Berryman Boulevard, bridge with sidewalk 36 <br />allowing crossing of Nancy Hill Creek. There are access points from West Hatterleigh here in 37 <br />Phase IV. 38 <br /> 39 <br />Larry Wright: You said there is a sidewalk on Berryman Boulevard that pedestrians can cross 40 <br />Nancy Hill Creek? 41 <br /> 42 <br />Michael Harvey: Yes. There is an access point off West Hatterleigh which allows access to 43 <br />those portions around Nancy hill Creek. The purpose of this document is to provide the board 44 <br />with the assurance we have met the obligation for providing connections from streets that no 45 <br />longer exist at least in the current development of this project but we have required the developer 46 <br />to comply with the nature of the request. 47 <br /> 48 <br />Jeff Schmitt: There are two bridges? 49 <br /> 50