Orange County NC Website
Approved 9/10/2013 <br /> <br />OC Board of Adjustment – 7/8/2013 Page 69 of 82 <br /> <br />SECTION 5.10.8 (B) – GENERAL SUBMITTAL REQUIREMENTS – SPECIAL USE PERMITS – CONTINUED ("Yes" 1 <br />indicates compliance; "No" indicates non-compliance) 2 <br />Ordinance Requirements <br />PLANNING STAFF <br />RECOMMENDED <br />FINDINGS <br />EVIDENCE SUBMITTED <br />TO SUPPORT FINDINGS <br />BOA <br /> FINDINGS <br /> <br />5.10.8 (B) (4) (w) <br />Continued <br /> <br />(vii) On tower sites, an FCC <br />registration sign, as applicable, <br />is also to be present. The signs <br />shall not be lighted, unless <br />applicable law, rule or <br />regulation requires lighting. <br />(viii) The use of any portion of a <br />tower for signs or advertising <br />purposes including company <br />name, banners, streamers, etc. <br />shall be strictly prohibited. <br />(ix) Mobile or immobile <br />equipment not used in direct <br />support of a tower facility shall <br />not be stored or parked on the <br />site of the telecommunication <br />tower, unless repairs to the <br />tower are being made. <br /> <br /> X Yes ___No Tab(s) 3 and 6 of the <br />application booklet contains <br />the required information. <br /> <br />Sheet C-11 of the site plan <br />contained within Tab 6 <br />provides the signage details <br />for the project, demonstrating <br />compliance with this provision. <br /> <br /> _x__Yes ___No <br />3