Orange County NC Website
Approved 9/10/2013 <br /> <br />OC Board of Adjustment – 7/8/2013 Page 65 of 82 <br /> <br />SECTION 5.10.8 (B) – GENERAL SUBMITTAL REQUIREMENTS – SPECIAL USE PERMITS – CONTINUED ("Yes" 1 <br />indicates compliance; "No" indicates non-compliance) 2 <br />Ordinance Requirements <br />PLANNING STAFF <br />RECOMMENDED <br />FINDINGS <br />EVIDENCE SUBMITTED <br />TO SUPPORT FINDINGS <br />BOA <br /> FINDINGS <br /> <br /> <br />5.10.8 (B) (4) (t) <br /> <br />All abandoned communication <br />wireless support structures shall <br />be removed within 12 months of <br />the cessation of use. A bond or <br />other security guaranteeing the <br />removal of the tower in the <br />event that it is abandoned or <br />unused for a period of 12 <br />months shall be posted. A cost <br />estimate shall be provided by a <br />qualified General Contractor <br />licensed in the State of North <br />Carolina. The amount of the <br />security shall be 110% of the <br />estimate. <br /> X Yes ___No The applicant acknowledges <br />the condition. <br /> <br />Language within the <br />application indicates this <br />condition will be adhered to. <br /> <br />This will be addressed prior to <br />the issuance of a Certificate of <br />Occupancy of the structure <br />and shall become a condition <br />of approval. <br /> _x__Yes ___No <br />5.10.8 (B) (4) (u) <br /> <br />A determination shall be made <br />that the facility and its <br />equipment will comply with all <br />federal, state and local <br />emission requirements, and the <br />Special Use Permit shall include <br />a statement that the facility and <br />its equipment will comply with <br />all federal, state and local <br />emission requirements. <br /> <br /> X Yes ___No The applicant acknowledges <br />the condition. <br /> <br />Language within the <br />application indicates this <br />condition will be adhered to. <br /> <br /> <br /> _x__Yes ___No <br />3