Orange County NC Website
Approved 9/10/2013 <br /> <br />OC Board of Adjustment – 7/8/2013 Page 55 of 82 <br /> <br />SECTION 5.10.8 (B) – GENERAL SUBMITTAL REQUIREMENTS – SPECIAL USE PERMITS – CONTINUED ("Yes" 1 <br />indicates compliance; "No" indicates non-compliance) 2 <br />Ordinance Requirements <br />PLANNING STAFF <br />RECOMMENDED <br />FINDINGS <br />EVIDENCE SUBMITTED <br />TO SUPPORT FINDINGS <br />BOA <br /> FINDINGS <br /> <br />5.10.8 (B) (4) (b) <br />Continued <br /> <br />b. Exceptions shall only be <br />allowed after a thorough <br />analysis of the search area, <br />provided by the applicant is <br />performed by the County’s <br />consultant or Staff, indicating <br />that coverage is not possible on <br />an existing wireless support <br />structure at the four-carrier <br />capacity or other user capacity <br />that can be achieved. There <br />must be an 80% approval vote <br />of the deciding board for this <br />specific finding to pass the <br />exception criteria. <br /> <br /> <br /> <br />3