Orange County NC Website
Approved 9/10/2013 <br /> <br />OC Board of Adjustment – 7/8/2013 Page 49 of 82 <br /> <br />SECTION 5.10.8 (B) – GENERAL SUBMITTAL REQUIREMENTS – SPECIAL USE PERMITS – CONTINUED ("Yes" 1 <br />indicates compliance; "No" indicates non-compliance) 2 <br />Ordinance Requirements <br />PLANNING STAFF <br />RECOMMENDED <br />FINDINGS <br /> <br />EVIDENCE SUBMITTED <br />TO SUPPORT FINDINGS <br />BOA <br />FINDINGS <br /> <br />5.8.10 (B) (3) (o) <br /> <br />All applications shall contain a <br />demonstration that the wireless <br />support structure is sited so as <br />to have the least visually <br />intrusive effect reasonably <br />possible and thereby have the <br />least adverse visual effect on <br />the environment and its <br />character, on existing <br />vegetation, and on the <br />residences in the area of the <br />telecommunications tower. <br /> X Yes ___No Tab(s) 3 and 7 of the <br />application booklet contains <br />the required information. <br /> <br /> <br /> _x__Yes ___No <br /> <br />5.8.10 (B) (3) (p) <br /> <br />A statement, prepared by a <br />professional engineer licensed <br />in the State of North Carolina, <br />which through rational <br />engineering analysis, certifies <br />the tower's compliance with <br />applicable standards as set <br />forth in the State of North <br />Carolina Building Code, and <br />any associated regulations; and <br />describes the tower's capacity, <br />including an example of the <br />number and type of antennas it <br />can accommodate. <br /> X Yes ___No Tab(s) 3 and 30 of the <br />application booklet contains <br />the required information. <br /> <br />Tab 30 contains a statement <br />authored by Margaret <br />Robinson of American Tower <br /> _x__Yes ___No <br />3