Browse
Search
BOA minutes 070813
OrangeCountyNC
>
Advisory Boards and Commissions - Active
>
Orange County Board of Adjustment
>
Minutes
>
2013
>
BOA minutes 070813
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/26/2018 9:17:41 AM
Creation date
3/7/2018 10:40:04 AM
Metadata
Fields
Template:
BOCC
Date
7/8/2013
Meeting Type
Regular Meeting
Document Type
Advisory Bd. Minutes
Document Relationships
BOA agenda 070813
(Attachment)
Path:
\Advisory Boards and Commissions - Active\Orange County Board of Adjustment\Agendas\2013
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
82
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Approved 9/10/2013 <br /> <br />OC Board of Adjustment – 7/8/2013 Page 33 of 82 <br /> <br />SECTION 5.10.8 (A) – STANDARDS FOR TELECOMMUNICATION FACILITIES 1 <br />("Yes" indicates compliance; "No" indicates non-compliance) 2 <br />Ordinance Requirements <br />PLANNING STAFF <br />RECOMMENDED <br />FINDINGS <br />EVIDENCE SUBMITTED <br />TO SUPPORT FINDINGS <br />BOA <br /> FINDINGS <br />5.10.8 (A) (1) (f) <br /> <br />A statement stating how the <br />proposed tower will minimize <br />visual intrusiveness to <br />surrounding properties in the <br />area. Criteria that may be used <br />for such evidence may be <br />height and type of existing trees <br />surrounding the proposed <br />tower, and local topography. <br /> <br /> X Yes ___No Tab(s) 3 and 7 of the <br />application booklet contains <br />the required information. <br /> _x__Yes ____No <br />5.10.8 (A) (1) (g) <br /> <br />A copy of the installed <br />foundation design including a <br />geotechnical sub-surface soils <br />investigation, evaluation report, <br />and foundation <br />recommendation for the <br />proposed wireless support <br />structure. <br /> <br /> X Yes ___No Tab(s) 3 and 41 of the <br />application booklet contain <br />required information. A final <br />geotech report is required prior <br />to the issuance of a building <br />permit. <br /> <br />Staff will recommend this <br />become a condition of <br />approval. <br /> <br /> _x__Yes ____No <br />5.10.8 (A) (1) (h) <br /> <br />The existing cell sites (latitude, <br />longitude, power levels) to <br />which this proposed site will be <br />a handoff candidate. <br /> <br /> X Yes ___No Tab(s) 15 and 21 of the <br />application booklet contains <br />the required information. <br /> _x__Yes ____No <br />5.10.8 (A) (1) (i) <br />Propagation studies of the <br />proposed site and showing all <br />adjoining planned, proposed, in- <br />service or existing sites. This <br />will include all of the modeling <br />information used to produce the <br />study including, but not limited <br />to, any assumptions made <br />about ambient tree height. <br /> X Yes ___No Tab(s) 17 and 20 of the <br />application booklet contains <br />the required information. <br /> _x__Yes ____No <br />3
The URL can be used to link to this page
Your browser does not support the video tag.