Browse
Search
BOA minutes 070813
OrangeCountyNC
>
Advisory Boards and Commissions - Active
>
Orange County Board of Adjustment
>
Minutes
>
2013
>
BOA minutes 070813
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/26/2018 9:17:41 AM
Creation date
3/7/2018 10:40:04 AM
Metadata
Fields
Template:
BOCC
Date
7/8/2013
Meeting Type
Regular Meeting
Document Type
Advisory Bd. Minutes
Document Relationships
BOA agenda 070813
(Attachment)
Path:
\Advisory Boards and Commissions - Active\Orange County Board of Adjustment\Agendas\2013
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
82
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Approved 9/10/2013 <br /> <br />OC Board of Adjustment – 7/8/2013 Page 16 of 82 <br /> <br />could not have been off the driveway. I was born and raised out there in that area and another question, I don’t still 1 <br />live out there but my dad does but most of the time around these towers, they have these great big generators. When 2 <br />the power goes out the generator kicks on and I am concerned about the noise. How big are the generators and how 3 <br />much noise will be coming from it? 4 <br /> 5 <br />Karen Kemerait: I would like to respond about the access road. Sesame Road is a DOT maintained road with a 60 6 <br />foot right-of-way and one of the ordinance requirements states that to the 60 foot wide right-of-way and one of the 7 <br />ordinance requirements states that public roads are to be utilized to the maximum extent possible. It is very important 8 <br />to know there will be very minimal traffic generated by this tower site. Once the tower is constructed, which I 9 <br />mentioned last month, which will be about a four week time period then the tower use will be low impact use and 10 <br />generates approximately two to four vehicle trips per month so it is much less minimal traffic type usage, type of use, 11 <br />than even residential use of the area so very little traffic will be generated. As far as the generator, Mr. Harvey, can 12 <br />you answer? 13 <br /> 14 <br />Liz Hill: I am with American Tower Corporation and I have been duly sworn. The generator at the site will be 218 feet 15 <br />from the nearest property line surrounded by trees. We complied with whatever noise ordinance the county has. I 16 <br />would like to point out that it only kicks on when the power goes out and the cable phone goes out and when other 17 <br />forms of communication go out when you need your phone. The purpose of the generator is backup communications 18 <br />when the primary power bridge fails. 19 <br /> 20 <br />Larry Wright: Doesn’t it go on to regenerate the battery? 21 <br /> 22 <br />Liz Hill: Correct. 23 <br /> 24 <br />Larry Wright: It is an on-demand generator? 25 <br /> 26 <br />Liz Hill: Correct. 27 <br /> 28 <br />Larry Wright: It will probably go on once a week for a few minutes. 29 <br /> 30 <br />Liz Hill: It will go on for testing once a month for a short period of time to make sure it is operating correctly, otherwise 31 <br />it will not be running in any longer period of time unless it is needed unless the power is out. 32 <br /> 33 <br />Samantha Cabe: Is there a regulation of the testing time? 34 <br /> 35 <br />Liz Hill: I think we can schedule it for during business hours. I don’t know if your ordinance requires that but we can 36 <br />certainly schedule it. 37 <br /> 38 <br />Samantha Cabe: Ms. Hill mentioned that the generator would be located 219 feet from the closest property line. That 39 <br />is the Yow’s property line. The generator will be 375 feet from Sesame Road. 40 <br /> 41 <br />Linda Ward: I am the owner of 801 Sesame Street Road and I am here because I am very concerned just as the 42 <br />realtor said about those people who are afraid of the cell towers, I am one of them. Very much afraid and very much 43 <br />concerned for my community and we were just talking about the generators that are located at the base of the cell 44 <br />towers and these generators must be maintained at a steady temperature of 77 degrees Fahrenheit. This temperature 45 <br />requirement is often compromised by poor maintenance and insufficient power due to power outages. Improperly 46 <br />maintained generators have been known to break down and leak fluid into the ground thereby polluting an 47 <br />underground water supply. All of Sesame Road people are on well pumps and I am really concerned about these 48 <br />things breaking down or the maintenance can’t get there on its monthly schedule or nobody even knew it was broken 49 <br />but we, in our community, would be the first one to feel the effects of it and if it is seeping into the ground and the 50 <br />water supply, how far will it go before it reaches University Lake. I think the risk is very great. The potential of trying to 51
The URL can be used to link to this page
Your browser does not support the video tag.