Orange County NC Website
Approved 7/8/2013 <br />OC Board of Adjustment – 6/10/2013 Page 58 of 92 <br />SECTION 5.10.8 (B) – GENERAL SUBMITTAL REQUIREMENTS – SPECIAL USE PERMITS – 1 <br />CONTINUED ("Yes" indicates compliance; "No" indicates non-compliance) 2 <br />Ordinance <br />Requirements <br />PLANNING <br />STAFF <br />RECOMMENDED <br />FINDINGS <br />EVIDENCE SUBMITTED <br />TO SUPPORT <br />FINDINGS <br />BOA <br /> FINDINGS <br /> <br />5.10.8 (B) (4) (t) <br /> <br />All abandoned <br />communication wireless <br />support structures shall be <br />removed within 12 months <br />of the cessation of use. A <br />bond or other security <br />guaranteeing the removal <br />of the tower in the event <br />that it is abandoned or <br />unused for a period of 12 <br />months shall be posted. A <br />cost estimate shall be <br />provided by a qualified <br />General Contractor <br />licensed in the State of <br />North Carolina. The <br />amount of the security <br />shall be 110% of the <br />estimate. <br /> <br /> X Yes ___No The applicant <br />acknowledges the <br />condition. <br /> <br />Language within the <br />application indicates this <br />condition will be adhered <br />to. <br /> <br />This will be addressed <br />prior to the issuance of a <br />Certificate of Occupancy <br />of the structure and shall <br />become a condition of <br />approval. <br /> _x_Yes ___No <br />5.10.8 (B) (4) (u) <br /> <br />A determination shall be <br />made that the facility and <br />its equipment will comply <br />with all federal, state and <br />local emission <br />requirements, and the <br />Special Use Permit shall <br />include a statement that <br />the facility and its <br />equipment will comply <br />with all federal, state and <br />local emission <br />requirements. <br /> <br /> X Yes ___No The applicant <br />acknowledges the <br />condition. <br /> <br />Language within the <br />application indicates this <br />condition will be adhered <br />to. <br /> <br /> <br /> _x_Yes ___No <br />3