Orange County NC Website
Approved 7/8/2013 <br />OC Board of Adjustment – 6/10/2013 Page 48 of 92 <br />SECTION 5.10.8 (B) – GENERAL SUBMITTAL REQUIREMENTS – SPECIAL USE PERMITS – 1 <br />CONTINUED ("Yes" indicates compliance; "No" indicates non-compliance) 2 <br />Ordinance <br />Requirements <br />PLANNING <br />STAFF <br />RECOMMENDED <br />FINDINGS <br />EVIDENCE SUBMITTED <br />TO SUPPORT <br />FINDINGS <br />BOA <br /> FINDINGS <br /> <br />5.10.8 (B) (4) (b) <br />Continued <br /> <br />b. Exceptions shall only <br />be allowed after a <br />thorough analysis of the <br />search area, provided by <br />the applicant is performed <br />by the County’s consultant <br />or Staff, indicating that <br />coverage is not possible <br />on an existing wireless <br />support structure at the <br />four-carrier capacity or <br />other user capacity that <br />can be achieved. There <br />must be an 80% approval <br />vote of the deciding board <br />for this specific finding to <br />pass the exception <br />criteria. <br /> <br /> <br /> <br />3